Commissioning Checklist - Appliances (free template)

13 sections and 73 questions that turn a service visit into a dated record of the system’s condition.

Every system serviced, and the record to show it.

What it covers

The Commissioning Checklist - Appliances runs to 13 sections and 73 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Pre-Installation and Delivery Checks
  2. Section 2: Electrical Connection and Certification
  3. Section 3: Gas Connection and Certification
  4. Section 4: Water Supply and Drainage
  5. Section 5: Ventilation and Clearances
  6. Section 6: Washing Machine
  7. Section 7: Dryer
  8. Section 8: Refrigerator
  9. Section 9: Dishwasher
  10. Section 10: Microwave
  11. Section 11: Rangehood
  12. Section 12: Cooktop
  13. Section 13: Documentation and Handover
ChecklistCommissioning Checklist - Appliances
StageBuilding systems and maintenance
LaneProperty managers and inspectors
Sections13
Questions73
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Aug 19, 2026
PriceFree on every plan

When to use it

Use it when the system is installed and ready to run, before the owner or operator accepts it. At 73 questions, this is a full inspection. Set time aside for it and walk it in the checklist’s order.

With 13 sections, from Pre-Installation and Delivery Checks to Documentation and Handover, use the app’s Jump to section list rather than scrolling.

Who uses it

Commissioning agents, MEP contractors and the installer’s engineers complete it; the owner’s team and the facilities manager receive it. Property managers read it to approve the next repair; contractors get their items with photos and a due date.

Before you walk it

  • Type readings into the number answers where the checklist asks, so the report shows the values, not just a tick.
  • Photograph the rating plate and the controls display at the time of each test.
  • Use the arrow and the measure tool on photos of corrosion, cracks or leaks, so the contractor sees exactly where and how big.
  • Work offline in plant rooms and roof spaces, then share the PDF once you are back in signal.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Commissioning Checklist - Appliances in the Easy Site Audit app and add it to a project: usually a unit, a tenancy or a property. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 13 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Managing a portfolio? Book a demo and see how a team runs these checklists as one turnover program.

Questions people ask

Does the Commissioning Checklist - Appliances replace the commissioning specification?

No. Follow the specification and the manufacturer’s procedure. The checklist is the structured record of what was tested and found, with photos and readings.

Can a contractor fill in the Commissioning Checklist - Appliances?

Yes. A contractor with the Easy Site Audit app can complete it on site and send you the signed PDF. Checklists are free to browse, add and fill in on every plan.

Is the Commissioning Checklist - Appliances free?

Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Turn the next unit with the evidence already on file.

Pick the checklist, photograph every room, give every repair an owner and file the signed report the same day.