Sheet HP-004 · Home and pre-purchase inspection · Free template
Electrical Commissioning Checklist (free template)
Inspect the property in a fixed order and report it under your own brand: 5 sections, 80 questions, a photo behind every finding.
A report the buyer can read, with a photo behind every finding.
What it covers
The Electrical Commissioning Checklist runs to 5 sections and 80 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Working Space and Facilities
- Section 2: Switchboard, Main Switch and Circuit Breaker
- Section 3: Distribution Boards
- Section 4: Conductors, Cables, and Wiring
- Section 5: Final Circuits
When to use it
Use it when the system is installed and ready to run, before the owner or operator accepts it. At 80 questions, this is a full inspection. Set time aside for it and walk it in the checklist’s order.
The 5 sections run from Working Space and Facilities to Final Circuits, and the app’s Jump to section list takes you straight to any of them.
Who uses it
Commissioning agents, MEP contractors and the installer’s engineers complete it; the owner’s team and the facilities manager receive it. The report goes to the buyer, owner or lender who booked the inspection, under your firm’s logo.
Before you walk it
- Type readings into the number answers where the checklist asks, so the report shows the values, not just a tick.
- Photograph the rating plate and the controls display at the time of each test.
- Set your company logo once and it appears on every report after that.
- Turn off the checklist section in the report options when a client wants only the findings.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Electrical Commissioning Checklist in the Easy Site Audit app and add it to a project: usually a unit, a tenancy or a property. Adding needs a connection; after that it works offline.
Walk it
Work through the 5 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Managing a portfolio? Book a demo and see how a team runs these checklists as one turnover program.
Questions people ask
Does the Electrical Commissioning Checklist replace the commissioning specification?
No. Follow the specification and the manufacturer’s procedure. The checklist is the structured record of what was tested and found, with photos and readings.
Can I brand the report?
Yes. Reports are white-label on every plan: your logo, your signature and your company name, with no watermark. Choose from 8 report themes.
Is the Electrical Commissioning Checklist free?
Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Turn the next unit with the evidence already on file.
Pick the checklist, photograph every room, give every repair an owner and file the signed report the same day.