Sheet HP-014 · Home and pre-purchase inspection · Free template
New Roof Inspection Checklist (free template)
Inspect the property in a fixed order and report it under your own brand: 7 sections, 28 questions, a photo behind every finding.
A report the buyer can read, with a photo behind every finding.
What it covers
7 sections and 28 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Visual Condition & Workmanship
- Section 2: Roof Deck & Underlayment
- Section 3: Flashing & Penetrations
- Section 4: Ventilation & Drainage
- Section 5: Sealants & Waterproofing
- Section 6: Structural & Safety Checks
- Section 7: Final Documentation & Handover
When to use it
Use it on a planned cycle, often in spring and fall, and after every major storm. At 28 questions, plan it as one sitting on site, not a quick tick on the way past.
7 sections, from Visual Condition & Workmanship through to Final Documentation & Handover. The app shows the page you are on and how many are left as you go.
Who uses it
Roofers, building surveyors and property managers complete it; owners and insurers receive the report. The report goes to the buyer, owner or lender who booked the inspection, under your firm’s logo.
Before you walk it
- Photograph from the safest point you can. Photos from a pole camera or a drone can be added from the photo library afterwards.
- Mark cracks, splits and lifted edges on the photo with the arrow and the measure tool.
- Pick a report theme that suits your clients: Photographic for photo-led reports, Minimal or Corporate for formal ones.
- Set your company logo once and it appears on every report after that.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the New Roof Inspection Checklist in the Easy Site Audit app and add it to a project: usually a unit, a tenancy or a property. Adding needs a connection; after that it works offline.
Walk it
Work through the 7 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Managing a portfolio? Book a demo and see how a team runs these checklists as one turnover program.
Questions people ask
How often should the New Roof Inspection Checklist be done?
On the cycle your maintenance plan or insurer sets, and after storms or any leak. The checklist records each inspection; the cycle is yours.
Does the New Roof Inspection Checklist certify the property?
No. It records what you inspected and what you found. It isn’t a certificate, a warranty or a guarantee of the property’s condition.
Does the New Roof Inspection Checklist work offline?
Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.
Turn the next unit with the evidence already on file.
Pick the checklist, photograph every room, give every repair an owner and file the signed report the same day.