Plumbing Commissioning Checklist (free template)
7 sections and 61 questions for one visit, so every technician checks the system the same way and the owner gets the same report.
Every system serviced, and the record to show it.
What it covers
The Plumbing Commissioning Checklist runs to 7 sections and 61 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Delivery Inspection
- Section 2: Storage Area
- Section 3: Pipework Storage
- Section 4: Pre-Installation Inspection
- Section 5: Maintenance/Access
- Section 6: General
- Section 7: Documentation
When to use it
Use it after a replacement or major repair, before the system goes back into service. With 61 questions, it is worth doing properly once rather than quickly twice: walk it in order and photograph as you go.
The 7 sections run from Delivery Inspection to Documentation, and the app’s Jump to section list takes you straight to any of them.
Who uses it
Commissioning agents, MEP contractors and the installer’s engineers complete it; the owner’s team and the facilities manager receive it. Owners read it to plan repairs and replacements; the maintenance file keeps it as the service history.
Before you walk it
- Raise an action plan for each open item, so acceptance waits on a short list, not a vague one.
- Type readings into the number answers where the checklist asks, so the report shows the values, not just a tick.
- Use the arrow and the measure tool on photos of corrosion, cracks or leaks, so the contractor sees exactly where and how big.
- Work offline in plant rooms and roof spaces, then share the PDF once you are back in signal.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Plumbing Commissioning Checklist in the Easy Site Audit app and add it to a project: usually a unit, a tenancy or a property. Adding needs a connection; after that it works offline.
Walk it
Work through the 7 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Managing a portfolio? Book a demo and see how a team runs these checklists as one turnover program.
Questions people ask
Does the Plumbing Commissioning Checklist replace the commissioning specification?
No. Follow the specification and the manufacturer’s procedure. The checklist is the structured record of what was tested and found, with photos and readings.
Does the Plumbing Commissioning Checklist replace a certified inspection?
No. Where a law or an insurer requires a certified engineer or licensed inspector, the checklist doesn’t replace them. It is the record of your own checks and services between those inspections.
Is the Plumbing Commissioning Checklist free?
Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.