Solar Panel Inspection Checklist (free template)

Service the system in the same order every visit, with 27 questions across 4 sections, and send a signed PDF to the owner the same day.

Every system serviced, and the record to show it.

What it covers

4 sections and 27 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Requirements for Roof-Mounted Arrays
  2. Section 2: Requirements for Ground-Mounted Arrays
  3. Section 3: Requirements for Signage Installation
  4. Section 4: Checking for Ratings and Equipment on Site
ChecklistSolar Panel Inspection Checklist
StageBuilding systems and maintenance
LaneProperty managers and inspectors
Sections4
Questions27
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Jun 14, 2024
PriceFree on every plan

When to use it

Use it before new or altered equipment is energized and handed over. 27 questions makes a focused inspection: long enough to cover the job properly, short enough to finish in one visit.

Its 4 sections (Requirements for Roof-Mounted Arrays, Requirements for Ground-Mounted Arrays, Requirements for Signage Installation and Checking for Ratings and Equipment on Site) keep related questions together.

Who uses it

Qualified electricians and electrical maintenance engineers complete it; the facilities manager owns the defects. Owners read it to plan repairs and replacements; the maintenance file keeps it as the service history.

Before you walk it

  • The checklist is not your safe system of work: isolate and test as your procedure requires before you start.
  • Photograph panel schedules, labels and rating plates. They are what the next engineer needs.
  • Raise every defect as an action plan with a priority, so the owner can see what is urgent and what can wait.
  • Keep each visit as its own project, titled with the building, the system and the date, so a search finds the history of one boiler.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Solar Panel Inspection Checklist in the Easy Site Audit app and add it to a project: usually a unit, a tenancy or a property. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 4 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Managing a portfolio? Book a demo and see how a team runs these checklists as one turnover program.

Questions people ask

Does the Solar Panel Inspection Checklist replace an electrical certificate?

No. Where an electrical certificate or a licensed inspection is required, only a qualified person can issue it. The checklist is the structured record of your inspection or maintenance.

Can a contractor fill in the Solar Panel Inspection Checklist?

Yes. A contractor with the Easy Site Audit app can complete it on site and send you the signed PDF. Checklists are free to browse, add and fill in on every plan.

Is the Solar Panel Inspection Checklist free?

Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Turn the next unit with the evidence already on file.

Pick the checklist, photograph every room, give every repair an owner and file the signed report the same day.

Start freeon iPhone and iPad
Start freeon iPhone and iPad