Property managers · Guide

Security deposit dispute evidence: what to record, and when

A deposit deduction is only as strong as the record behind it. This guide covers what to photograph and note at move-in and move-out, and when to send it, so each charge points to a dated photo from both ends of the tenancy.

Every deduction with a dated photo behind it, from both walks.

SheetPI-06

TitleDeposit dispute evidence

For
Property managers
Sheet type
Guide
Words
Move-in and move-out; check-in and check-out in the UK
Revised
20 Oct 2026

The move-in report is the baseline

Most deposit arguments are not really about the move-out. They are about the move-in. If the carpet stain is on the move-out photos and nowhere on the move-in report, nobody can say when it appeared, and a deduction for it rests on your memory against the tenant’s.

So the move-in walk deserves the same care as the move-out: every room, every wall, the inside of the oven, the window locks, the meter readings. A thin move-in report makes a fair charge hard to explain a year later, when the person who walked the unit may not even work for you anymore.

In the UK the same records are the check-in and check-out reports, often called the inventory, and the deposit is the tenancy deposit. The evidence works the same way.

Wear and tear or damage?

Every deposit conversation comes down to this question, and the answer is not yours alone to give. Whether scuffed paint in a hallway after three years is normal wear or damage is a judgment, and the rules in your state or country frame it: what can be deducted, how deductions are itemized, what notice the tenant gets and when the balance has to be returned.

Those rules vary widely, and this guide does not cover them. Check the rules where the property is, or ask someone who advises landlords there.

What the record can do is give whoever makes that judgment the facts: the condition on the first day, the condition on the last day, how long the tenant lived there, and what the repair cost. Age matters too. Note when the carpet was fitted or the walls were last painted, so a reviewer can see how much life was left in them.

How to build the record, walk by walk

Eight habits, the same at both ends of the tenancy.

  1. Walk the unit before the keys go out

    Do the move-in inspection after the turnover cleaning and repairs, and before the tenant moves a single box in. An empty unit shows the floors, baseboards and walls that furniture will hide for the next year.

  2. Same rooms, same order, both walks

    Start at the front door and work through the unit in a fixed order: entry, living room, kitchen, bathrooms, bedrooms, laundry, outside. Use the same checklist at move-out so each room’s photos line up with the move-in set. Someone reading the two reports side by side should never have to hunt for the bathroom.

  3. A wide shot, then the close-up

    A close-up of a burn mark shows the mark but not where it is. Take one wide photo of the wall or the counter first, then the close-up. Two photos of the same defect, with the room in the title, leave no doubt about which counter you mean.

  4. Put a size on it

    Draw a measure line across the chip, the crack or the stain and label it in inches or centimeters. “Small mark on the door” means little at move-out. A 2 in scuff with an arrow pointing at it is clear to anyone.

  5. Turn on photo timestamps

    Set the report to print the time on each photo, and pick the date format your market reads. The dated PDF then shows when each photo went into the record.

  6. Get a signature at the end of the walk

    Walk the tenant through what you recorded while you are both standing in the unit, then hand them the iPad to sign. The signature records that the tenant saw what you recorded, while you were both looking at it, rather than in an email weeks later.

  7. Send the report the same day

    Email the PDF to the tenant and the owner before you leave the building, or that evening at the latest. A report sent on the day of the walk reads as a record. One sent after a deduction letter reads as an argument.

  8. Keep the invoice beside the photo

    When the painter or the carpet cleaner bills you, file the invoice with the move-out photo of the work they did. A deduction with the before photo, the after photo and the invoice can be explained in one sentence.

What every deduction needs behind it

Before a charge goes in the deduction letter, check that the file holds each of these.

  • A move-in photo of the same spot, or a move-in note saying it was in good condition.
  • A move-out photo, wide and close, with the room in the title.
  • A size, drawn with the measure tool, when the size decides the cost.
  • A note in plain words: what it is, where it is, and what it will take to repair.
  • The date of each walk, printed on the report and on the photos.
  • The tenant’s signature from the move-out walk, or a note that they declined to sign or did not attend.
  • The age of the item where you know it: when the carpet was fitted or the room was last painted.
  • The repair invoice or a written quote, filed with the photo.
  • A copy of each report sent to the tenant, and the date you sent it.

How the record comes together in Easy Site Audit

Easy Site Audit is the inspection and audit platform that takes you from checklist to signed-off report. Inspectors work in the Easy Site Audit app on iPhone and iPad, online or off, so a basement unit with no signal is still recorded.

Open a project for the unit and start from the ready-made move-in and move-out checklist: rooms set out as sections, Yes, No or N/A on each question, and a note and photos on any question. Each defect you find becomes an issue with up to 5 photos, an arrow and a measure line, and a name in Assigned To for whoever will repair it.

At move-out, duplicate the move-in project and copy the checklist and issue titles, so the same rooms come back in the same order. Or add a move-out report to the same project and merge both reports into one PDF. The platform doesn’t compare the two walks for you; it puts them where a reviewer can read them together. The full setup is on the property inspection software page.

What works today, and what’s on the roadmap

  • TodayDated PDF reports with time-printed photos, markup and a signature on the cover.
  • TodayMove-in and move-out kept in one project, merged into one PDF when you need both together.
  • TodayOffline capture on iPhone and iPad, with cloud sync for signed-in users (uploading needs Pro).
  • On the roadmapAn evidence trail for every item, with “Show me” links that replay the move-in and move-out photos for a tenant or landlord.
  • On the roadmapRe-inspection loops that reopen a repair until the photo shows the work done.

Questions people ask

Will photos decide a deposit dispute?

No. Photos give whoever reviews the dispute the facts: what the room looked like at move-in, what it looked like at move-out, and when each photo was taken. The rules in your state or country decide what can be deducted. In Easy Site Audit, the Timestamp Report Photos option prints a time on each photo.

Can the tenant sign the report?

Yes, on the iPad at the end of the walk. The report cover carries one signature, drawn on the screen, with a name and company beside it. Today there is one signature line per report, so decide whose signature your process needs before you hand over the iPad.

How long should I keep move-in and move-out reports?

Keep them at least as long as a deposit claim can be raised where the property is; those rules differ by state and country, so check yours. Signed-in users can sync projects, reports and photos to the cloud, so the record isn’t only on one iPad. Uploading needs Pro.

Do I need photos of rooms with nothing wrong?

Yes. A clean wall at move-in is the baseline that makes a marked wall at move-out mean something. In the checklist, answer the question and add photos to it (2 or 4, set by the checklist), so the good condition is on the record as well as the defects.

Does it work without signal?

Yes. Answering, photographing and generating the PDF all work offline in the Easy Site Audit app on iPhone and iPad, so a basement unit or a building with thick walls is fine. Browsing and adding checklists from the library needs a connection, so add the checklist before you go.

Make the next move-in the record you’ll need at move-out.

Start freeon iPhone and iPad
Start freeon iPhone and iPad