Cooling Tower Commissioning Checklist (free template)

20 sections and 109 questions for one visit, so every technician checks the system the same way and the owner gets the same report.

Every system serviced, and the record to show it.

What it covers

109 questions across 20 sections. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: General
  2. Section 2: Electrical General
  3. Section 3: Variable Speed Drive
  4. Section 4: Controls System/Valves & Interlocks
  5. Section 5: Ambient Air Intake & Fill Pack
  6. Section 6: Pond/Cold Water Basin
  7. Section 7: Electric Heater
  8. Section 8: Sweeper System
  9. Section 9: Makeup Water Connection
  10. Section 10: Bleed-Off/Blowdown Connection
  11. Section 11: Side Stream Filtration Connection
  12. Section 12: Overflow Pipework
  13. Section 13: Drift Eliminator
  14. Section 14: Fan & Motor
  15. Section 15: Ductwork
  16. Section 16: Access
  17. Section 17: Pipework to Nozzles
  18. Section 18: Pipework from Tower
  19. Section 19: Balance Pipework / Equalizing Pipework
  20. Section 20: Controls
ChecklistCooling Tower Commissioning Checklist
StageBuilding systems and maintenance
LaneProperty managers and inspectors
Sections20
Questions109
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Sep 10, 2024
PriceFree on every plan

When to use it

Use it at start-up and functional testing, with the installer present, so the readings and results are recorded once, on the day. With 109 questions, split the walk by section if you need to. Everything saves on the device, and the app counts what is still to answer.

20 sections cover a lot of ground, from General to Controls. Walk them in order, or jump to the one you are standing in.

Who uses it

Installers use it as their own test record; the client’s engineer witnesses the tests. Owners read it to plan repairs and replacements; the maintenance file keeps it as the service history.

Before you walk it

  • Photograph the rating plate and the controls display at the time of each test.
  • Raise an action plan for each open item, so acceptance waits on a short list, not a vague one.
  • Where the checklist asks for a reading, type the number in, so the next visit has something to compare against.
  • Raise every defect as an action plan with a priority, so the owner can see what is urgent and what can wait.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Cooling Tower Commissioning Checklist in the Easy Site Audit app and add it to a project: usually a unit, a tenancy or a property. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 20 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Managing a portfolio? Book a demo and see how a team runs these checklists as one turnover program.

Questions people ask

Does the Cooling Tower Commissioning Checklist replace the commissioning specification?

No. Follow the specification and the manufacturer’s procedure. The checklist is the structured record of what was tested and found, with photos and readings.

Can a contractor fill in the Cooling Tower Commissioning Checklist?

Yes. A contractor with the Easy Site Audit app can complete it on site and send you the signed PDF. Checklists are free to browse, add and fill in on every plan.

Can I change the questions in the Cooling Tower Commissioning Checklist?

Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.

Turn the next unit with the evidence already on file.

Pick the checklist, photograph every room, give every repair an owner and file the signed report the same day.

Start freeon iPhone and iPad
Start freeon iPhone and iPad