Sheet SS-026 · Site safety · Free template
Excavation Inspection Checklist (free template)
A ready-made safety check: 4 sections, 18 questions, and 4 photos on any question where the evidence matters. Free in the Easy Site Audit app.
Every shift starts with the checks done and the evidence on file.
What it covers
4 sections and 18 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Selecting the Right Plant
- Section 2: Planning, Scheduling and Coordinating the Excavation Work
- Section 3: Excavation Work Siting and Setup
- Section 4: Working in the Excavation Safely
When to use it
Use it before people work at height or in the excavation, at the start of each shift, and after bad weather. 18 questions gives a full picture of one job without turning it into a day’s work.
The 4 sections split the job into Selecting the Right Plant, Planning, Scheduling and Coordinating the Excavation Work, Excavation Work Siting and Setup and Working in the Excavation Safely.
Who uses it
Site managers and safety leads complete it; the scaffold or groundworks contractor owns the defects. The report goes to the site manager and the safety lead, and into the site file for audits and inspections.
Before you walk it
- Mark defects on the photo with the arrow, so the scaffolder can find them.
- Inspect again after any alteration, and keep the reports in date order.
- Use the arrow in the photo markup to point at the defect. On a busy photo of a machine, the arrow tells the fitter where to look.
- Do the check where the work is. The checklist works with no signal, so a basement or an excavation is no reason to fill it in later.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Excavation Inspection Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.
Walk it
Work through the 4 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.
Questions people ask
How often should the Excavation Inspection Checklist be done?
Before first use, at the interval your regulator and your site plan require, and after any event that could affect it, such as high winds or an alteration. Your plan sets the frequency; the checklist records each inspection.
Does using the Excavation Inspection Checklist make my site compliant?
No checklist can do that. It records that the check was done, what was found and who is fixing it, with photos and a signature. Compliance comes from doing the right checks, by competent people, and acting on what they find.
Does the Excavation Inspection Checklist work offline?
Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.
Run the next handover as a program, not a pile of PDFs.
Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.