Checklist library · Builders and contractors

Construction checklists

Ready-made checklists for the work between the first pour and the signed handover: trade quality checks, site safety, daily site records and the punch list walk. Free in the Easy Site Audit app on every plan.

Handover signed. Final payment and retainage released.

Lane
Builders and contractors
Checklists
139
Stages
4
Price
Free on every plan

Why builders and contractors run on checklists

A handover is lost long before handover day. It slips when drywall closes over a pipe nobody checked, when a scaffold tag is a week out of date, or when the punch list lives in three notebooks and a phone. Each checklist on this page is one of the inspections that stops that happening, written down so every walk asks the same questions in the same order.

Run them as a program, not as one-off forms. Quality checks follow each trade as it finishes. Safety checks run before the shift. The daily record notes what happened on site. The handover walk, the re-inspection and the final sign-off close the job. When each of those ends in a signed PDF with photos, the closeout file is assembled as the job goes.

Every checklist opens in the Easy Site Audit app on iPhone and iPad. Answer Yes, No or N/A, add photos to any question, open an action plan with an owner and a due date wherever an answer needs fixing, and finish with one white-label PDF report.

Start from the stage you are at

The stages of the program, in the order most teams take them on. Each one has its own page with what the stage involves.

  1. Handover and closeoutStart here

    The pre-handover walk, the punch list, the re-inspection and the final sign-off.

    20checklists
  2. Quality and trades

    Trade-by-trade quality checks: pre-pour, framing, rough-in, pre-drywall, roofing, waterproofing and commissioning.

    48checklists
  3. Site safety

    Pre-use plant and tool checks, scaffold and lifting inspections, risk assessments and site safety audits.

    58checklists
  4. Site management and daily

    Daily and field reports, pre-start checks, housekeeping walks and the clean before handover.

    13checklists

20 checklists

Handover and closeout

The pre-handover walk, the punch list, the re-inspection and the final sign-off. How this stage runs

48 checklists

Quality and trades

Trade-by-trade quality checks: pre-pour, framing, rough-in, pre-drywall, roofing, waterproofing and commissioning. How this stage runs

58 checklists

Site safety

Pre-use plant and tool checks, scaffold and lifting inspections, risk assessments and site safety audits. How this stage runs

Every checklist here is free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

Which construction checklist should I start with?

Start where the money is: the handover and closeout stage. A punch list or handover checklist on the pre-handover walk shows what is open before the client sees it. Add trade quality checks next, so fewer items reach the punch list at all.

Do these checklists work for snagging in the UK?

Yes. The snagging and new-build handover checklists suit UK handovers, and you can rename Issue, Report and Assigned To in the app so your reports say snag, snag list and responsible trade.

Can a checklist replace the inspection my contract or regulator requires?

No. A checklist records what was checked, by whom and when, with photos. It doesn’t certify anything or guarantee compliance. Use it to run the inspections your contract, your building inspector or your safety plan calls for, and keep the signed report as your record.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.