HVAC Change Out Checklist (free template)
A ready-made service checklist: 10 sections, 32 questions, and up to 4 photos per question for the condition of the equipment.
Every system serviced, and the record to show it.
What it covers
The HVAC Change Out Checklist runs to 10 sections and 32 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Inspection
- Section 2: Permits and Permissions
- Section 3: Safety Precautions
- Section 4: Component Removal
- Section 5: Installation
- Section 6: System Testing
- Section 7: Customer Walkthrough
- Section 8: Final Documentation
- Section 9: Maintenance Schedule
- Section 10: Competitor Analysis
When to use it
Use it when the system is installed and ready to run, before the owner or operator accepts it. 32 questions gives a full picture of one job without turning it into a day’s work.
10 sections, from Inspection through to Competitor Analysis. The app shows the page you are on and how many are left as you go.
Who uses it
Commissioning agents, MEP contractors and the installer’s engineers complete it; the owner’s team and the facilities manager receive it. The report goes to the owner and into the building’s maintenance file; insurers and buyers ask for it later.
Before you walk it
- Type readings into the number answers where the checklist asks, so the report shows the values, not just a tick.
- Photograph the rating plate and the controls display at the time of each test.
- Use the arrow and the measure tool on photos of corrosion, cracks or leaks, so the contractor sees exactly where and how big.
- Work offline in plant rooms and roof spaces, then share the PDF once you are back in signal.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the HVAC Change Out Checklist in the Easy Site Audit app and add it to a project: usually a unit, a tenancy or a property. Adding needs a connection; after that it works offline.
Walk it
Work through the 10 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Managing a portfolio? Book a demo and see how a team runs these checklists as one turnover program.
Questions people ask
Does the HVAC Change Out Checklist replace the commissioning specification?
No. Follow the specification and the manufacturer’s procedure. The checklist is the structured record of what was tested and found, with photos and readings.
Can a contractor fill in the HVAC Change Out Checklist?
Yes. A contractor with the Easy Site Audit app can complete it on site and send you the signed PDF. Checklists are free to browse, add and fill in on every plan.
Does the HVAC Change Out Checklist work offline?
Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.
Turn the next unit with the evidence already on file.
Pick the checklist, photograph every room, give every repair an owner and file the signed report the same day.