Sheet BS-011 · Building systems and maintenance · Free template

Church Building Maintenance Checklist (free template)

A ready-made service checklist: 4 sections, 33 questions, and up to 4 photos per question for the condition of the equipment.

Every system serviced, and the record to show it.

What it covers

4 sections and 33 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Roof & Structure
  2. Section 2: Gutters & Drainage
  3. Section 3: Walls, Masonry & Doors/Windows
  4. Section 4: Internal Systems & Grounds
ChecklistChurch Building Maintenance Checklist
StageBuilding systems and maintenance
LaneProperty managers and inspectors
Sections4
Questions33
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Jan 28, 2026
PriceFree on every plan

When to use it

Use it when you take over a property or site, to record its condition on day one. At 33 questions, plan it as one sitting on site, not a quick tick on the way past.

The 4 sections split the job into Roof & Structure, Gutters & Drainage, Walls, Masonry & Doors/Windows and Internal Systems & Grounds.

Who uses it

Maintenance technicians, caretakers and property or facilities managers complete it; the owner receives the report. The report goes to the owner and into the building’s maintenance file; insurers and buyers ask for it later.

Before you walk it

  • Title each visit’s project with the site and the date, so the history reads in order.
  • Photograph each item’s condition, not only the defects, so the next visit has a baseline.
  • Where the checklist asks for a reading, type the number in, so the next visit has something to compare against.
  • Raise every defect as an action plan with a priority, so the owner can see what is urgent and what can wait.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Church Building Maintenance Checklist in the Easy Site Audit app and add it to a project: usually a unit, a tenancy or a property. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 4 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Managing a portfolio? Book a demo and see how a team runs these checklists as one turnover program.

Questions people ask

Does the Church Building Maintenance Checklist replace a certified inspection?

No. Where a law or an insurer requires a certified engineer or licensed inspector, the checklist doesn’t replace them. It is the record of your own checks and services between those inspections.

How often should the Church Building Maintenance Checklist be used?

On the service cycle the manufacturer, your insurer or local rules set, and after any repair or failure. The checklist doesn’t set the cycle; it records each visit.

Is the Church Building Maintenance Checklist free?

Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Turn the next unit with the evidence already on file.

Pick the checklist, photograph every room, give every repair an owner and file the signed report the same day.

Start freeon iPhone and iPad
Start freeon iPhone and iPad