Piling Rig Inspection Checklist (free template)

The Piling Rig Inspection Checklist turns a routine safety check into a dated record: 10 sections, 58 questions, and an owner for every defect.

Every shift starts with the checks done and the evidence on file.

What it covers

58 questions across 10 sections. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Cleanliness
  2. Section 2: Slew and Winch
  3. Section 3: Running Controls
  4. Section 4: Environmental
  5. Section 5: Mast Mountings
  6. Section 6: Other
  7. Section 7: Undercarriage
  8. Section 8: Hydraulics System
  9. Section 9: Engine
  10. Section 10: Drill Head
ChecklistPiling Rig Inspection Checklist
StageSite safety
LaneBuilders and contractors
Sections10
Questions58
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Mar 18, 2025
PriceFree on every plan

When to use it

Use it before the machine is used, at the start of each shift, and whenever it changes hands between operators. 58 questions makes a thorough walk. Answers save on the device as you go, so a break in the middle loses nothing.

The 10 sections run from Cleanliness to Drill Head, and the app’s Jump to section list takes you straight to any of them.

Who uses it

Operators complete the pre-use check; supervisors and plant managers review the reports and own the defects. Safety managers read it to see what was found and who is fixing it; the site file keeps it as the record of the check.

Before you walk it

  • If a defect means the machine must not be used, set High priority and say so in the action plan.
  • Use the arrow on photos to point at leaks, wear and damage for the fitter.
  • Do the check where the work is. The checklist works with no signal, so a basement or an excavation is no reason to fill it in later.
  • Duplicate the last project to start the next site, keeping its titles and its checklist, and change only what is different.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Piling Rig Inspection Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 10 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

Who should complete the Piling Rig Inspection Checklist?

The operator before use, and a competent person at the periodic inspections your plan sets. The site manager reviews the defects.

Can the Piling Rig Inspection Checklist be filled in without signal?

Yes. Once the checklist is added in the Easy Site Audit app, answering, photos and the report all work offline. You need a connection only to add checklists and to sync.

Does the Piling Rig Inspection Checklist work offline?

Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.

Start freeon iPhone and iPad
Start freeon iPhone and iPad