Sheet HP-022 · Home and pre-purchase inspection · Free template
Solar Site Survey Checklist (free template)
Walk the property in the checklist’s order, 5 sections and 14 questions, and hand over a branded PDF before you leave.
A report the buyer can read, with a photo behind every finding.
What it covers
The Solar Site Survey Checklist runs to 5 sections and 14 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Main Service Panel
- Section 2: Document Shading and Other Obstructions
- Section 3: Roof Condition
- Section 4: Roof Dimensions, Pitch, and Rafter Spacing
- Section 5: Additional Information
When to use it
Use it at each planned inspection or maintenance visit, with the equipment isolated where your procedure requires it. At 14 questions, it is short enough to run every time it is due, which is the point: a check that is quick gets done.
5 sections, from Main Service Panel through to Additional Information. The app shows the page you are on and how many are left as you go.
Who uses it
Qualified electricians and electrical maintenance engineers complete it; the facilities manager owns the defects. Buyers read it to decide; their agent or lawyer may use it to negotiate. Clear photos keep that conversation about facts.
Before you walk it
- Photograph panel schedules, labels and rating plates. They are what the next engineer needs.
- Type readings into the number answers where the checklist asks for them.
- Photograph each defect twice: a close-up for the detail and a wide shot so the reader knows where it is.
- Use the measure tool to put the size of a crack or gap on the photo itself.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Solar Site Survey Checklist in the Easy Site Audit app and add it to a project: usually a unit, a tenancy or a property. Adding needs a connection; after that it works offline.
Walk it
Work through the 5 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Managing a portfolio? Book a demo and see how a team runs these checklists as one turnover program.
Questions people ask
Does the Solar Site Survey Checklist replace an electrical certificate?
No. Where an electrical certificate or a licensed inspection is required, only a qualified person can issue it. The checklist is the structured record of your inspection or maintenance.
Can I brand the report?
Yes. Reports are white-label on every plan: your logo, your signature and your company name, with no watermark. Choose from 8 report themes.
Can I change the questions in the Solar Site Survey Checklist?
Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.
Turn the next unit with the evidence already on file.
Pick the checklist, photograph every room, give every repair an owner and file the signed report the same day.