Sheet BS-055 · Building systems and maintenance · Free template

Swamp Cooler Maintenance Checklist (free template)

7 sections and 26 questions for one visit, so every technician checks the system the same way and the owner gets the same report.

Every system serviced, and the record to show it.

What it covers

7 sections and 26 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: General Condition
  2. Section 2: Power Supply & Electrical
  3. Section 3: Water Supply & Distribution
  4. Section 4: Cooling Pads
  5. Section 5: Fan & Motor
  6. Section 6: Drainage & Water Pan
  7. Section 7: Seasonal Maintenance
ChecklistSwamp Cooler Maintenance Checklist
StageBuilding systems and maintenance
LaneProperty managers and inspectors
Sections7
Questions26
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Oct 17, 2025
PriceFree on every plan

When to use it

Use it at each planned service, and before the season the system works hardest in. 26 questions makes a focused inspection: long enough to cover the job properly, short enough to finish in one visit.

7 sections, from General Condition through to Seasonal Maintenance. The app shows the page you are on and how many are left as you go.

Who uses it

HVAC technicians and maintenance engineers complete it; the facilities or property manager reviews the defects. Owners read it to plan repairs and replacements; the maintenance file keeps it as the service history.

Before you walk it

  • Photograph filters before and after changing them.
  • Photograph the rating plate first: make, model and serial number tie the report to the unit.
  • Where the checklist asks for a reading, type the number in, so the next visit has something to compare against.
  • Raise every defect as an action plan with a priority, so the owner can see what is urgent and what can wait.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Swamp Cooler Maintenance Checklist in the Easy Site Audit app and add it to a project: usually a unit, a tenancy or a property. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 7 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Managing a portfolio? Book a demo and see how a team runs these checklists as one turnover program.

Questions people ask

How often should the Swamp Cooler Maintenance Checklist be done?

On the service cycle the manufacturer and your maintenance plan set for this equipment, and after any fault. The checklist records each service; it doesn’t set the cycle.

Can a contractor fill in the Swamp Cooler Maintenance Checklist?

Yes. A contractor with the Easy Site Audit app can complete it on site and send you the signed PDF. Checklists are free to browse, add and fill in on every plan.

Does the Swamp Cooler Maintenance Checklist work offline?

Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.

Turn the next unit with the evidence already on file.

Pick the checklist, photograph every room, give every repair an owner and file the signed report the same day.

Start freeon iPhone and iPad
Start freeon iPhone and iPad