Punch list · Use case

Apartment and multi-unit punch lists

On a multifamily job the punch list isn’t one list. It’s one per unit, plus corridors, stairs, amenity spaces and the garage, all closing toward the same owner walk. Here is how that runs in Easy Site Audit, told through a fictional building.

Every unit accepted on its own signed PDF, and the owner walk spent on units that are actually ready.

SheetPL-06

TitleApartment punch lists

For
Builders and contractors
Sheet type
Use case
Words
US English: punch item, closeout, retainage
Revised
20 Oct 2026

One floor of Harmon Street Apartments, from walk to owner walk

A four-story building over a podium garage. The superintendent walks the third floor nine days before the owner walk.

  1. FoundDana walks unit 304 door-first with the apartment punch list attached to the project. Twenty-two items, nearly all finishes: caulk short at the tub, roller marks in the hall, a cabinet door rubbing its frame, a GFCI that won’t reset.
  2. OwnedEach item gets a trade before Dana leaves the room: paint Blue, carpentry Orange, electrical Red. The PDF is built in the corridor with no signal and sent to the foremen from the stair, as soon as the phone finds a bar.
  3. FixedOn the back-punch Dana filters by Blue and walks only the painter’s items. Each gets an after photo on the same item and moves to Completed. Two aren’t right, so they stay In Progress with a comment.
  4. Handed overUnit 304 moves to Completed in the projects list. The walk and the back-punch merge into one signed PDF for the owner’s rep, and the third floor is ready three days before the owner walk.
Illustration. Places, people and numbers are fictional.Easy Site Audit

Set the building up the way it will be accepted

Make one project per unit, then one each for the corridors and stairs, the amenity spaces, and the garage and site. Each unit then has its own status, its own PDF and its own record, which is how the owner’s rep and, later, the property manager will ask for it: unit by unit.

Set the first unit up properly: the checklist, your words (Punch item and Trade, in Settings → Customization) and the trade colors. Then duplicate that project for the next unit and choose what to copy. Take the checklist and color tag, leave the photos and comments, and every unit starts from the same setup, so every PDF reads the same.

Title items with the unit and room first: “304 · Primary bath · caulk short at tub”. A search for “304” or “Primary bath” then pulls up exactly what you need on the back-punch, and the owner’s rep can read any page of the report without a key.

Common areas close the building, not the units

Units get the attention, but a building isn’t ready for residents until the shared spaces are done, and those are the areas the owner and the inspectors walk first. Keep them in their own projects so they don’t hide inside a unit’s list.

The usual items: fire door closers and latching, exit signs, stair nosings and handrails, corner guards and corridor carpet seams, elevator lobby finishes and unit signage, mailroom and package room fit-out, trash room drainage, garage striping and lighting, and the site itself: curb ramps, landscaping debris, light poles and fences.

A building today, and on the roadmap

  • TodayOne project per unit and per common area, sortable by status
  • TodayDuplicate a unit’s setup for the next one, choosing what to copy
  • TodayTrade colors to filter each sub’s items on the back-punch
  • On the roadmapA web dashboard per building is on the roadmap: units ready, open items by trade
  • On the roadmapAutomatic chasing of each sub’s open items across every unit, on the roadmap

Where to go next

For the step-by-step walk, read how to run a punch walk. For what each check covers, see the free punch list template. And for how closeout runs across every building you deliver, start with punch list software or the Program.

Questions people ask

Should I make one project per unit or per floor?

One per unit, if each unit is accepted on its own. Each project keeps its own status and produces its own PDF, so you can show the owner’s rep exactly which units are ready. Use one project per floor only when the owner accepts by floor.

How do I start the next unit quickly?

Duplicate the last one. Easy Site Audit lets you choose what to copy: titles, assignees, comments, photos, the checklist and the color tag. Copy the checklist and color tag, leave the photos and comments, and the next unit starts from the same setup.

Can several superintendents punch the same building?

Yes, each in their own account on their own iPhone or iPad, from the same ready-made checklist, sharing reports as PDF. One Pro subscription covers one account, so each person walking units has their own.

Run the next building one unit at a time, with every unit on file.

Book a demo for the building, or start free on the first unit.

Start freeon iPhone and iPad
Start freeon iPhone and iPad