Sheet HC-002 · Handover and closeout · Free template

Building Handover Inspection Checklist (free template)

Use it on the pre-handover walk, the re-inspection and the final sign-off, so all three reports ask the same 211 questions in the same order.

Closeout signed. Final payment and retainage released.

What it covers

23 sections and 211 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Site Conditions
  2. Section 2: Site Improvements/Conditions
  3. Section 3: Outbuildings
  4. Section 4: External
  5. Section 5: Brickwork
  6. Section 6: Balcony
  7. Section 7: Patio
  8. Section 8: Porch
  9. Section 9: Verandah
  10. Section 10: Deck
  11. Section 11: Carport
  12. Section 12: Frame
  13. Section 13: Roof Framing
  14. Section 14: Roof Covering
  15. Section 15: Floor
  16. Section 16: Joinery
  17. Section 17: Each Internal Room
  18. Section 18: Specifically for Kitchen/Meals
  19. Section 19: Specifically for each Bedroom
  20. Section 20: Specifically for each Bathroom
  21. Section 21: Specifically for each Toilet
  22. Section 22: Specifically for Laundry
  23. Section 23: Specifically for Garage/Carport/Storeroom
ChecklistBuilding Handover Inspection Checklist
StageHandover and closeout
LaneBuilders and contractors
Sections23
Questions211
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Jun 26, 2023
PriceFree on every plan

When to use it

Use it in the weeks before handover, while there is still time to close what it finds, and again on the day. At 211 questions, it is a big checklist. Use the section list to plan the walk, and expect to come back to it more than once.

23 sections cover a lot of ground, from Site Conditions to Specifically for Garage/Carport/Storeroom. Walk them in order, or jump to the one you are standing in. Property managers use it too, for the same job across their buildings.

Who uses it

Project managers and site managers run it; the client, the operator or the facilities team receives it. The PDF is what the owner’s side reads before releasing the final payment, so it carries your logo and your photos, with no watermark.

Before you walk it

  • Agree the checklist with the client before the walk, so handover day has no surprises.
  • Photograph meter readings, serial numbers and the keys handed over. They are the first things asked about later.
  • Photograph the whole wall as well as the close-up. The trade needs to find the item, not just see it.
  • Put the location in each item’s title: “Unit 4B, bedroom 2, door binds on frame”. Issues have no separate location field, so the title carries it.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Building Handover Inspection Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 23 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

What should a handover report include?

What was inspected, what was found, who owns each open item and when it is due, with photos and a signature. Easy Site Audit puts all of that in one PDF, with the checklist answers after the issues.

Is a punch list the same as a snag list?

Yes. Punch list is the US name and snag list the UK one for the same job: the items to fix before handover. You can rename Issue and Report in the app, so the PDF says punch item or snag, whichever your client uses.

Does the Building Handover Inspection Checklist work offline?

Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.

Start freeon iPhone and iPad
Start freeon iPhone and iPad