Punch list · Guide

Punch list vs snag list: same job, two names

A punch list and a snag list are the same thing: the defects and unfinished work found before a building is accepted. The US says punch list; the UK, Ireland and Australia say snag list. The contract words around the list differ more than the list itself.

SheetPL-07

TitlePunch list vs snag list

For
Builders and contractors
Sheet type
Guide
Words
US English: punch item, closeout, retainage
Revised
20 Oct 2026

The same job in two vocabularies

Read across a row: the US word, the UK and Irish word, and what both mean on site.

USUK and IrelandWhat it means
punch listsnag listThe list of defects and unfinished work before acceptance
punch itemsnagOne thing on the list
punch walksnagging, snagging inspectionWalking the building to make the list
back-punchre-inspectionRe-walking open items to confirm each fix
substantial completionpractical completionThe building can be used, with only minor items left; the formal list is written here
closeouthandoverPassing the finished building and its documents to the owner
retainageretentionMoney held back from each payment until the work is accepted
warranty perioddefects liability period, rectification periodTime after completion when the builder fixes defects that appear
general contractor (GC)main contractorThe firm holding the building contract
superintendentsite managerThe builder’s person running the site day to day
owner’s rep, architectemployer’s agent, contract administrator, clerk of worksThe people who walk the list for the client
caulkmastic, sealantThe bead at tubs, counters and trim
baseboardskirtingThe trim at the bottom of a wall
drywallplasterboardWall and ceiling board
countertopworktopThe kitchen work surface
faucet, outlet, elevatortap, socket, liftSame fittings, different names
first floorground floorThe floor at street level, so a US second floor is a UK first floor

What actually differs in practice

Who walks the list. On US commercial and multifamily work, the architect or owner’s rep writes the punch list at substantial completion, after the GC’s superintendent has run a pre-punch. On UK new-build housing, the buyer often pays an independent snagger to walk the home after completion, and the housebuilder’s customer care team works through that list under the new-home warranty. The list is the same; the person holding the pen is not.

When the money moves. In the US, the retainage held back from every pay application comes back once the punch list is closed and the closeout documents are in. In the UK, retention works the same way, but on many standard-form contracts part of it comes back at practical completion and the rest at the end of the defects liability period.

How the report reads. A US report says color and October 20, 2026. A UK report says colour and 20 October 2026, and calls the second floor the first. If your firm works on both sides of the Atlantic, the report should match the client, not the office.

Running either list in Easy Site Audit

The walk and the evidence are identical. A few settings make each report read right for its client.

  1. Rename the terms

    In Settings → Customization, change Issue to Punch item or Snag, Assigned To to Trade, and Report to whatever your client calls the walk. The words apply across the app and every PDF, so switch them before you start a job in the other market.

  2. Pick the checklist for the market

    US punch lists such as the new home punch list, or UK snag lists such as the new-build snagging list. Both sit in the Construction library’s handover and closeout stage.

  3. Set the date format

    Choose from 24 date formats so the report prints dates the way the client writes them.

  4. Send the same evidence

    Photos, markup, trades and comments print the same way in either market. The report is white-label, so only your logo, signature and name appear on it.

Words to check before a report crosses the Atlantic

  • Item name: punch item or snag, set in Settings → Customization.
  • Assignee label: Trade, Sub or Contractor.
  • Dates: month first for US clients, day first for UK and Irish clients.
  • Floor names: write the floor the way the client numbers it.
  • Finishes in item titles: caulk or mastic, baseboard or skirting, drywall or plasterboard.
  • Contract terms in comments: substantial or practical completion, retainage or retention.
  • Measure tool units: inches and feet, or millimeters and meters.

Keep reading on punch lists

For the US side in depth, read what is a punch list and how to run a punch walk, or see how closeout runs on punch list software from Easy Site Audit.

Questions people ask

Is a snag list the same as a punch list?

Yes. Both list the defects and unfinished work to correct before a building is accepted. Punch list is the US and Canadian term; snag list is used in the UK, Ireland, Australia, New Zealand and the Middle East. The difference is vocabulary, not the inspection.

What is snagging called in the US?

A punch walk, or walking the punch list. The re-check of open items is often called a back-punch, and the finished list is attached to the certificate of substantial completion rather than to a practical completion certificate.

Is practical completion the same as substantial completion?

They play the same role. Both mark the point where the building can be used for its purpose with only minor items left, and both are when the formal list is written. The exact definition depends on the contract, so check the one you signed.

Can one Easy Site Audit account produce both punch lists and snag lists?

Yes. Rename Issue to Punch item or Snag in Settings → Customization, pick a US or UK checklist from the Construction library, and choose the date format. The wording applies across the app, so change it before you switch markets.