New Home Punch List (free template)

The New Home Punch List gives the closeout walk a fixed order, 14 sections and 128 questions, so nothing depends on who happens to walk it.

Closeout signed. Final payment and retainage released.

What it covers

The New Home Punch List runs to 14 sections and 128 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Ceilings
  2. Section 2: Walls and Interior Finishes
  3. Section 3: Doors and Windows
  4. Section 4: Cabinets and Counters
  5. Section 5: Flooring
  6. Section 6: Kitchen and Appliances
  7. Section 7: Bathrooms
  8. Section 8: Plumbing
  9. Section 9: Electrical
  10. Section 10: Hvac
  11. Section 11: Exterior and Drainage
  12. Section 12: Garage
  13. Section 13: Safety Systems
  14. Section 14: Builder Handover
ChecklistNew Home Punch List
StageHandover and closeout
LaneBuilders and contractors
Sections14
Questions128
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Aug 19, 2026
PriceFree on every plan

When to use it

Use it on the pre-handover walk, as soon as the trades say an area is finished, then at the re-inspection and the final walk with the owner. At 128 questions, this is a major inspection, best planned as its own visit. Answers save on the device as you go, so you can stop and pick it up again.

14 sections cover a lot of ground, from Ceilings to Builder Handover. Walk them in order, or jump to the one you are standing in.

Who uses it

Superintendents and project managers walk it first; the owner’s representative or the architect often walks it again at closeout. The PDF is what the owner’s side reads before releasing the final payment, so it carries your logo and your photos, with no watermark.

Before you walk it

  • Put the room and the trade in each punch item’s title, so the report reads the way the trades work.
  • Give every punch item to one trade with a due date on the action plan, and close it with a photo of the fix.
  • Close items with a photo of the fix, not a tick. The after photo is the one the client will ask for.
  • Send the PDF before you leave the site. A report that waits for the office waits behind everything else in the office.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the New Home Punch List in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 14 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

What goes on a punch list?

Anything that doesn’t meet the contract at closeout: damaged or unfinished finishes, missing hardware, fixtures that don’t work, and cleaning. Most items are finishes such as paint, caulk, trim and doors.

Does a signed handover report prove the work is complete?

It records what was inspected, what was found and what was closed, with timestamped photos and your signature. It is evidence for the conversation with the client, not a certificate of completion or compliance.

Can I change the questions in the New Home Punch List?

Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.

Start freeon iPhone and iPad
Start freeon iPhone and iPad