New-build snagging, room by room
On a new-build site the snag list is the last thing between a finished plot and a completion date. Walk each plot room by room in the Easy Site Audit app, give every snag a trade, re-inspect with an after photo, and send one signed PDF with the keys.
Plots handed over on the date the sales office promised, with the buyer’s snag list shorter than yours.
SheetS-04
TitleNew-build snagging
- For
- Builders and contractors
- Sheet type
- Use case
- Words
- UK English: snag, handover, retention
- Revised
- 20 Oct 2026
Plot 14, from first walk to keys
A three-bed semi on the second phase of a fictional development, Ashby Meadows. The site manager has nine days to completion.
- FoundThe pre-handover walk on Plot 14 turns up 38 snags. Most are finishes: a split skirting mitre in Bed 2, mastic missing behind the kitchen sink, paint on the en-suite light switch, a back door that needs a shoulder to lock. Each one is photographed, marked up with an arrow, and titled with the room.
- OwnedEvery snag gets a trade and a colour: Blue for the decorator, Red for the joiner, Yellow for the plumber, Green for the electrician. The extractor fan that doesn’t run and the back door go to High priority. The PDF is with the trades by lunchtime.
- FixedFour days later the site manager re-walks the plot with the list. The after photo goes on the same snag as the before, and 35 of the 38 move to Completed. The back door is still stiff, so it stays In Progress with a comment for the joiner.
- Handed overThe last three are closed on the second re-walk. The walk and both re-inspections merge into one signed PDF, which goes to the sales office and the buyer with the keys.
Why new-build snagging is a numbers game
One plot is a morning’s work. A phase of forty is a production line, and the snag list is where the line stops. Trades are on to the next phase, the sales office has completion dates booked, and every plot that slips puts a buyer in temporary accommodation and a phone call in customer care.
The defects themselves are rarely the problem. They are the same on every plot: paint, mastic, skirting, doors, windows, kitchens and bathrooms, and on the apartment blocks the entrance, the lift lobby, the car park and the fences. What breaks down is the close-out. The list goes out, the trade says it is done, and nobody walks back in to check until the buyer’s snagger finds it. Snagging software is built around that gap.
Where the snags are on a typical plot
The same handful of places, plot after plot. Walk them first and walk them hardest.
- Decoration in every room: patches and roller marks under a torch, paint on sockets and glass, unpainted door tops.
- Mastic and sealant: behind the sink and hob, round the bath and shower tray, and where the skirting meets the floor.
- Skirting, architrave and door linings: open mitres, unfilled pins, gaps to the wall.
- Doors: internal doors that drift or won’t latch, front and back doors that need force to lock.
- Kitchens: misaligned cupboard doors, loose plinths, worktop joints, appliances that don’t match the spec.
- Bathrooms: rocking WC pans, slow wastes, hollow tiles, extractor fans that don’t run.
- Outside: mortar smears on brickwork, unconnected downpipes, gates that won’t latch, rubble under the turf.
How a plot runs on Easy Site Audit
One project per plot
Create the first plot from a ready-made checklist such as the new-build snagging list. For the next plot, duplicate the project and copy the checklist and the colour tag, leaving the last plot’s photos and comments behind.
Walk room by room, photo first
Go room by room in the same order on every plot. Take the photo and name the snag later if you are moving fast: add up to 50 photos at once and each becomes its own snag. Write the room at the start of each title so the list reads in walking order.
Trade, colour, priority
Rename “Assigned To” to “Trade” once, and write the trade on each snag. Use one colour tag per trade so you can filter the list down to the decorator’s snags on the re-walk. Anything that stops completion is High.
Re-inspect against the photos
On the re-walk, open the snag, compare the work with the before photo, and add the after photo next to it. Each snag holds up to 5 photos, so the defect and the fix travel together into the report.
Hand over with one PDF
Merge the reports for the plot into one A4 PDF, choose a report theme, sign on the screen, and send it to the sales office, the buyer or the employer’s agent before you leave site.
Today, and where the Program goes next
- TodayPlot-by-plot snagging from ready-made checklists, offline
- TodayBefore and after photos on the same snag, with markup
- TodayDuplicate a plot to start the next one with the same trades
- On the roadmapRe-inspection loops that send each trade’s open snags back for a second walk, on the roadmap
- On the roadmapA web dashboard for the development is on the roadmap: plots ready to hand over and open snags by trade