Sheet HC-008 · Handover and closeout · Free template
New Build Handover Checklist (free template)
6 sections, 30 questions and a signed PDF at the end: the New Build Handover Checklist turns the closeout walk into a record you can show the client item by item.
Closeout signed. Final payment and retainage released.
What it covers
6 sections and 30 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Exterior Inspection
- Section 2: Interior Fixtures & Finishes
- Section 3: Utilities & Services
- Section 4: Kitchens & Bathrooms
- Section 5: Safety & Compliance
- Section 6: Documentation & Handover
When to use it
Use it to check that everything due at handover is there: the work, the documents, the keys and the training. At 30 questions, plan it as one sitting on site, not a quick tick on the way past.
The 6 sections run from Exterior Inspection to Documentation & Handover, and the app’s Jump to section list takes you straight to any of them. Property managers use it too, for the same job across their buildings.
Who uses it
Project managers and site managers run it; the client, the operator or the facilities team receives it. Project managers read it to see what is still open; the client reads it to see what was fixed.
Before you walk it
- Sign the report on the screen at the end of the walk and send the PDF before you leave.
- Agree the checklist with the client before the walk, so handover day has no surprises.
- Put the location in each item’s title: “Unit 4B, bedroom 2, door binds on frame”. Issues have no separate location field, so the title carries it.
- Give every item to one trade. An item owned by “the contractor” is owned by nobody.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the New Build Handover Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.
Walk it
Work through the 6 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.
Questions people ask
What should a handover report include?
What was inspected, what was found, who owns each open item and when it is due, with photos and a signature. Easy Site Audit puts all of that in one PDF, with the checklist answers after the issues.
Does a signed handover report prove the work is complete?
It records what was inspected, what was found and what was closed, with timestamped photos and your signature. It is evidence for the conversation with the client, not a certificate of completion or compliance.
Can I change the questions in the New Build Handover Checklist?
Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.
Run the next handover as a program, not a pile of PDFs.
Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.