Cooling System Maintenance Checklist (free template)
Turn a service visit into a service record: 35 questions across 9 sections, with photos of the equipment’s condition.
Every system serviced, and the record to show it.
What it covers
9 sections and 35 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: General Condition
- Section 2: Electrical & Controls
- Section 3: Airflow & Filters
- Section 4: Refrigerant System
- Section 5: Cooling Coils & Heat Exchangers
- Section 6: Water System
- Section 7: Mechanical Components
- Section 8: System Performance
- Section 9: Seasonal & Preventive Maintenance
When to use it
Use it at each planned service, and before the season the system works hardest in. At 35 questions, plan it as one sitting on site, not a quick tick on the way past.
9 sections, from General Condition through to Seasonal & Preventive Maintenance. The app shows the page you are on and how many are left as you go.
Who uses it
HVAC technicians and maintenance engineers complete it; the facilities or property manager reviews the defects. The report goes to the owner and into the building’s maintenance file; insurers and buyers ask for it later.
Before you walk it
- Photograph the rating plate first: make, model and serial number tie the report to the unit.
- Type readings (temperatures, pressures, currents) into the number answers where the checklist asks, so the next service can compare.
- Work offline in plant rooms and roof spaces, then share the PDF once you are back in signal.
- Where the checklist asks for a reading, type the number in, so the next visit has something to compare against.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Cooling System Maintenance Checklist in the Easy Site Audit app and add it to a project: usually a unit, a tenancy or a property. Adding needs a connection; after that it works offline.
Walk it
Work through the 9 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Managing a portfolio? Book a demo and see how a team runs these checklists as one turnover program.
Questions people ask
How often should the Cooling System Maintenance Checklist be done?
On the service cycle the manufacturer and your maintenance plan set for this equipment, and after any fault. The checklist records each service; it doesn’t set the cycle.
Does the Cooling System Maintenance Checklist replace a certified inspection?
No. Where a law or an insurer requires a certified engineer or licensed inspector, the checklist doesn’t replace them. It is the record of your own checks and services between those inspections.
Does the Cooling System Maintenance Checklist work offline?
Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.