Sheet HC-003 · Handover and closeout · Free template

Construction Project Handover Checklist (free template)

11 sections, 83 questions and a signed PDF at the end: the Construction Project Handover Checklist turns the closeout walk into a record you can show the client item by item.

Closeout signed. Final payment and retainage released.

What it covers

83 questions across 11 sections. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Building Fabric and Construction
  2. Section 2: Mechanical Services
  3. Section 3: Electrical Services
  4. Section 4: Fire Safety
  5. Section 5: Security
  6. Section 6: Basic Information
  7. Section 7: Certificates and Approvals
  8. Section 8: Services, Plant, and Equipment
  9. Section 9: Test Certificates
  10. Section 10: Fire, Health and Safety
  11. Section 11: Miscellaneous
ChecklistConstruction Project Handover Checklist
StageHandover and closeout
LaneBuilders and contractors
Sections11
Questions83
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Jun 14, 2024
PriceFree on every plan

When to use it

Use it when the building, unit or system passes from the builder to the owner or operator, with both sides present if you can. With 83 questions, it is worth doing properly once rather than quickly twice: walk it in order and photograph as you go.

11 sections, from Building Fabric and Construction through to Miscellaneous. The app shows the page you are on and how many are left as you go.

Who uses it

Builders run it with the client’s representative, so both sides sign off the same record. Project managers read it to see what is still open; the client reads it to see what was fixed.

Before you walk it

  • Photograph meter readings, serial numbers and the keys handed over. They are the first things asked about later.
  • Sign the report on the screen at the end of the walk and send the PDF before you leave.
  • Put the location in each item’s title: “Unit 4B, bedroom 2, door binds on frame”. Issues have no separate location field, so the title carries it.
  • Give every item to one trade. An item owned by “the contractor” is owned by nobody.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Construction Project Handover Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 11 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

What should a handover report include?

What was inspected, what was found, who owns each open item and when it is due, with photos and a signature. Easy Site Audit puts all of that in one PDF, with the checklist answers after the issues.

Does a signed handover report prove the work is complete?

It records what was inspected, what was found and what was closed, with timestamped photos and your signature. It is evidence for the conversation with the client, not a certificate of completion or compliance.

Can I change the questions in the Construction Project Handover Checklist?

Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.