Builders · Use case

Building handover inspections

A building handover inspection decides whether the owner accepts the work and releases the final payment. Easy Site Audit runs it as three walks from ready-made handover checklists: the pre-handover walk, the re-inspection and the final walk, with every punch item owned by a trade and a signed report for the closeout package.

Handed over on the date you promised, with the record to show for it.

SheetCI-04

TitleHandover inspections

For
Builders and contractors
Sheet type
Use case
Words
US English: punch item, closeout, retainage
Revised
20 Oct 2026

Home 7 at Fenwick Row

One home in a phase of 18, from the first walk to the closeout package.

  1. FindingFenwick Row, Phase 2, home 7. Ten days before the owner’s walk, the project manager walks the home against a building handover checklist and logs 23 punch items: paint touch-ups, a sticking patio door, two loose outlet covers, missing sealant at the tub, a cracked tile at the entry.
  2. OwnedEach item goes into the report for its trade: nine for the painter, six for the carpenter, four for the tiler and four for the electrician. Each trade has its own PDF that afternoon, with a marked-up photo of every item.
  3. FixedSix days later the re-inspection finds 21 items completed, each with an after photo. The patio door is On Hold for a replacement roller, and its comment records the delivery date.
  4. Handed overThe final walk with the owner’s rep clears the last two items. The project manager signs on the iPad, merges the four trade reports into one PDF, and it goes into the closeout package the same day.
Illustration. Places, people and numbers are fictional.Easy Site Audit

What a handover inspection is for

On a US job the handover walk sits at substantial completion. The owner, the architect or the owner’s rep walks the work with the general contractor, and the punch list that comes out of it stands between the GC and final payment. The retainage held back from each pay application is usually released once that list is closed and the closeout documents are in.

The inspection itself is rarely the problem. The weeks after it are. Items spread across five trades, fixes nobody checked, and a final walk that turns into a second punch list because the first one never closed. A handover inspection that ends in a PDF and nothing else leaves all of that to memory and email.

In the UK, Ireland and Australia the same walk is snagging at practical completion; see snagging software.

Three walks to a closeout

  1. The pre-handover walk

    Start from a ready-made handover checklist and walk each home, unit or floor. Photograph every item, mark it up, and write the room into its title. Keep one report per trade inside the project, and color-tag by floor or building when you run several.

  2. Send each trade its list

    Generate each trade’s PDF and send it by email or the iPhone and iPad share options. The trade sees its own items, the marked-up photos and the comments, and doesn’t need the app.

  3. The re-inspection

    Walk the open work again. Move each fix to Completed and add the after photo. Leave anything not ready at In Progress or On Hold, with a comment saying what it is waiting for.

  4. The final walk

    Walk the last items with the owner’s rep, sign on the screen, and merge the trade reports into one PDF with your logo and a cover photo of the building.

  5. Into the closeout package

    File the signed report with the warranties, O&M manuals, as-builts and lien waivers your contract calls for. Easy Site Audit produces the inspection record; it doesn’t store the rest of the package.

What the handover report should prove

Read the PDF the way the owner’s rep will before you send it.

  • Every area on the checklist was walked, and each section shows how much of it was answered.
  • Every punch item has a photo, the room or fixture in its title, and the trade responsible.
  • Each fix has an after photo beside the before.
  • Anything still open says in its comment what it is waiting for.
  • The report is signed and dated, and carries your company’s name rather than a software watermark.

Questions people ask

How many walks does a handover take?

Usually three: the pre-handover walk that produces the punch list, a re-inspection once the trades have worked it, and the final walk with the owner or their rep. Easy Site Audit keeps all three in the same project, so the final walk starts from what is still open.

Can I send each subcontractor only their own items?

Yes. Keep a report per trade inside the project, and each trade’s PDF holds only its own items, with the marked-up photos and comments. Merge the reports into one PDF for the owner when the list is ready.

Can the owner’s rep sign the report?

The report carries one signature, drawn on the screen and printed on the cover with a name and company. A second signature block for the client isn’t available, so the owner’s rep signs off on the filed copy or in the closeout paperwork.

Does it work for a building with many units?

Yes. Make each unit, floor or building its own project, then duplicate the first for the rest with the same checklist, titles and assignees. Common areas such as the lobby, stairs and parking get a project of their own, so they aren’t lost inside the last unit’s list.

Run the next handover as a program, not a pile of PDFs.