Sheet BS-058 · Building systems and maintenance · Free template
Underground Plumbing Inspection Checklist (free template)
9 sections and 36 questions that turn a service visit into a dated record of the system’s condition.
Every system serviced, and the record to show it.
What it covers
9 sections and 36 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: General Information & Site Access
- Section 2: Pipe Material & Installation
- Section 3: Slope, Flow & Alignment
- Section 4: Leak Testing & Water Tightness
- Section 5: Backflow & Venting
- Section 6: Drainage & Sewer Connections
- Section 7: Water Supply Lines (if applicable)
- Section 8: Backfilling & Marking
- Section 9: Documentation & Final Approval
When to use it
Use it before pipework is covered, and again at testing. 36 questions makes a focused inspection: long enough to cover the job properly, short enough to finish in one visit.
9 sections, from General Information & Site Access through to Documentation & Final Approval. The app shows the page you are on and how many are left as you go.
Who uses it
Plumbing contractors and in-house maintenance teams use it; the property or facilities manager owns the repairs. Property managers read it to approve the next repair; contractors get their items with photos and a due date.
Before you walk it
- Type test pressures and readings into the number answers where the checklist asks.
- Put the location of each leak or defect in the issue title.
- Use the arrow and the measure tool on photos of corrosion, cracks or leaks, so the contractor sees exactly where and how big.
- Work offline in plant rooms and roof spaces, then share the PDF once you are back in signal.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Underground Plumbing Inspection Checklist in the Easy Site Audit app and add it to a project: usually a unit, a tenancy or a property. Adding needs a connection; after that it works offline.
Walk it
Work through the 9 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Managing a portfolio? Book a demo and see how a team runs these checklists as one turnover program.
Questions people ask
Does the Underground Plumbing Inspection Checklist replace a licensed plumber’s certificate?
No. Where a licensed plumber’s certificate or a water authority test is required, the checklist doesn’t replace it. It is the structured record of your inspection or service.
How often should the Underground Plumbing Inspection Checklist be used?
On the service cycle the manufacturer, your insurer or local rules set, and after any repair or failure. The checklist doesn’t set the cycle; it records each visit.
Can I change the questions in the Underground Plumbing Inspection Checklist?
Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.
Turn the next unit with the evidence already on file.
Pick the checklist, photograph every room, give every repair an owner and file the signed report the same day.