Sheet PM-020 · Planned and preventive maintenance · Free template
Electrical Safety Inspection Checklist (free template)
The Electrical Safety Inspection Checklist gives every technician the same order of work: 1 section, 18 questions, and an owner for each deficiency.
Every PPM task done, signed and on file before the client asks.
What it covers
1 section and 18 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Electrical Safety
When to use it
Use it at each planned inspection or maintenance visit, with the equipment isolated where your procedure requires it. 18 questions gives a full picture of one job without turning it into a day’s work.
Everything sits in one section, Electrical Safety, so the questions run straight through with no jumping about.
Who uses it
Qualified electricians and electrical maintenance engineers complete it; the facilities manager owns the defects. Clients read it at the monthly or quarterly review; contract managers use it to show the SLA was met.
Before you walk it
- Type readings into the number answers where the checklist asks for them.
- The checklist is not your safe system of work: isolate and test as your procedure requires before you start.
- Work offline in plant rooms and risers, then share the PDF once you are back in signal.
- Use the client’s words: rename Issue to Deficiency in the app, so the report matches the contract.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Electrical Safety Inspection Checklist in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.
Walk it
Work down the questions in order. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.
Questions people ask
Does the Electrical Safety Inspection Checklist replace an electrical certificate?
No. Where an electrical certificate or a licensed inspection is required, only a qualified person can issue it. The checklist is the structured record of your inspection or maintenance.
Can the app schedule PPM visits?
Not yet. Automations for scheduling and reminders are on the roadmap. Today your PPM schedule says when a visit is due, and the checklist in the Easy Site Audit app records it.
Can I change the questions in the Electrical Safety Inspection Checklist?
Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.
Make the next walk-round the one nobody can question.
Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.