Facilities · Use case
Planned preventive maintenance inspections
A preventive maintenance checklist turns a PPM visit into evidence: every asset checked in the same order, readings recorded, and each deficiency photographed and owned before you leave the mechanical room. Easy Site Audit runs the visit in the field app on iPhone and iPad, online or off, and ends it in a signed, white-label PDF.
Every PPM visit on the record, every deficiency owned, nothing to rebuild from memory at the monthly review.
SheetFI-02
TitlePlanned preventive maintenance
- For
- Facilities teams
- Sheet type
- Use case
- Words
- Walk-round, deficiency, PPM, SLA
- Revised
- 20 Oct 2026
What a PPM visit has to prove
Your planner says the task was due. Your client wants to know it was done, what the engineer found, and what happens next. A closed task in the CMMS doesn’t show the state of the filter bank, the belt that was glazed, or the condensate tray that was holding water when nobody was looking.
That record is what you lean on when the client asks, three months later, why an air handler tripped. Photos, readings and a named owner for every deficiency make it a short conversation.
This page is part of facility inspection software for FM contractors and in-house teams. For the general fabric of the building, see building walk-round inspections.
Harbor Point: the March PPM visit
A five-story office building with a rooftop plant deck and a basement mechanical room, run by an FM contractor.
- FoundOn the rooftop plant deck, Marcus works through the AHU service checklist for AHU-2. The filter bank is loaded and the condensate tray is standing full. He answers No, adds four photos, and notes the pressure drop across the filters.
- OwnedThe action plan goes to the HVAC subcontractor, picked from his contacts: replace the filters and clear the drain line, priority High, due in seven days.
- No signalDown in the basement mechanical room, the booster pump is weeping at the gland. There is no signal, so the photo issue saves on the iPad: an arrow on the drip, placed with the magnifier loupe, and the plumbing contractor written into Assigned To.
- FixedSix days later the HVAC engineer swaps the filters. Marcus opens the same project, adds an after photo to the filter question, records the date and the new reading in its note, and updates the action plan’s status.
- Handed overMarcus signs the report on the iPad. Priya, the owner’s facilities manager, has the PDF for the monthly review: the readings, before and after photos, and each action plan with its owner, priority and due date.
How a PPM visit runs in Easy Site Audit
The same five moves on every visit, from an air handler service to a generator run.
Start from the asset’s checklist
Pick a ready-made preventive maintenance checklist for the plant in front of you: an air handler, a rooftop unit, a pump, a generator, a boiler or a distribution board. Add it once with a connection and it works anywhere after that. A project carries one checklist, so set up one project per asset or plant area for each visit.
Record what you saw and measured
Answer each question with Yes, No or N/A. Where the checklist asks for a reading, there is a number or temperature field; elsewhere, type it into the note. Attach photos and one note to any question, so the evidence sits against the exact check it belongs to.
Raise each deficiency to a contractor
On an answer that needs action, write what needs fixing and pick the assignee from your contacts. Set a priority and a due date (the default is seven days out). Anything off the checklist, like a missing guard, becomes a photo issue with up to 5 photos, markup and a name in Assigned To.
Close it with proof
When the fix is done, open the same project, add the after photo, write what was done and when into the comment, and move it to Completed. Status doesn’t print on the issue entry, so the comment carries the close-out; color tags do print, as dots.
Send the report before you leave
Sign on the screen, pick one of the 8 report themes, add your logo, and share the PDF by email or the iPhone and iPad share options. Several reports in one project merge into one PDF for the review pack.
What stays in your CMMS
Easy Site Audit is not maintenance software. The PPM calendar, the asset register, work orders and parts stay in your CMMS or planner, and Easy Site Audit doesn’t connect to it today. It records the inspection and produces the report; attach the PDF to the work order. The CMMS knows what is due. The roof is where the evidence is made.
Today and on the roadmap
- TodayStart next month’s visit by duplicating this one, choosing whether to copy titles, assignees, comments, photos, the checklist and color tags.
- TodayA project keeps the checklist version it started with, so an update never changes a visit you already reported.
- TodayAnswering, photos and the PDF all work with no signal; signed-in users sync to the cloud later (uploading needs Pro).
- On the roadmapScheduling PPM visits, with reminders when one is due.
- On the roadmapAutomatic follow-ups to contractors on open action plans, and re-inspection loops.
- On the roadmapA web dashboard per site: open deficiencies by contractor and items fixed at the first re-inspection.
Preventive maintenance checklists for the plant you look after
Ready-made checklists from the planned and preventive maintenance stage of the library. All are free to add and fill in.
- Planned and preventive maintenanceAHU Service Checklist
- Planned and preventive maintenanceRoutine HVAC Maintenance Checklist
- Planned and preventive maintenancePump Maintenance Checklist
- Planned and preventive maintenanceGenerator Inspection Checklist
- Planned and preventive maintenanceRTU Maintenance Checklist for Rooftop Units
- Planned and preventive maintenanceElectrical Distribution Board Inspection Checklist
- Planned and preventive maintenanceElectric Boiler Maintenance Checklist
Questions people ask
Does Easy Site Audit plan our PPM visits for us?
Not yet; scheduling and reminders are on the roadmap. Today the PPM calendar stays in your CMMS or planner, and you start each visit by duplicating the last project, choosing whether to copy titles, assignees, comments, photos, the checklist and color tags.
Can I record temperatures and pressures?
Yes, where the checklist asks for them. Checklists offer number and temperature fields alongside Yes, No and N/A answers and text fields. Any other reading can go in the note on that question, with photos of the gauge or display.
Does it work in a basement mechanical room with no signal?
Yes. Once a checklist is added, answering, photos and generating the PDF all work offline in the Easy Site Audit app. You need a connection to browse or add checklists, and signed-in users sync when the signal comes back.
Will a checklist update change last quarter’s report?
No. A project keeps the checklist version it started with, and the PDF prints that version. Updates are never installed automatically: you accept them, with a note of what changed.