Planned and preventive maintenance checklists

Planned preventive maintenance (PPM) checklists for the assets a facilities team keeps running: HVAC and air handling, electrical distribution, pumps and boilers, lifts, escalators and grounds.

Every PPM task done, signed and on file before the client asks.

Stage
Planned and preventive maintenance
Checklists
72
Lane
Facilities and maintenance teams
Price
Free on every plan

What the planned and preventive maintenance stage involves

A PPM schedule is a promise to the client: these assets, these tasks, this often. The schedule lives in a spreadsheet or a maintenance system. The proof that each task was done lives wherever the technician wrote it down. That second half is what a checklist fixes.

Each checklist here is one PPM visit for one kind of asset, in the order the work is done. Photos show condition, number answers record readings where the checklist asks for them, and any deficiency becomes an action plan with an owner, a priority and a due date.

When the client’s quarterly review comes round, the evidence is a set of signed PDFs, one per visit, each with the photos that show the asset was looked at, not just ticked.

How this stage runs

  1. Weekly

    Quick checks on critical plant: pumps, generators and fire systems.

  2. Monthly

    Routine servicing: filters, belts, drives and panels.

  3. Quarterly and annual

    Major services, testing and the inspections your contract or insurer requires.

  4. Deficiency follow-up

    Each deficiency assigned with a due date, and checked again when the fix is done.

72 planned and preventive maintenance checklists

Every planned and preventive maintenance checklist in the library, A to Z. Each page shows its sections, its size and when to use it.

Practical points for this stage

  • Photograph the asset tag or rating plate first, so the report is tied to one asset.
  • Where the checklist asks for a reading, type the number in, so the next visit can compare.
  • Raise each deficiency as an action plan with the contractor, a priority and a due date. Open work stays visible until it is completed.
  • Title each project with the site, the asset and the visit date, so the history of one asset is one search away.
  • Work offline in plant rooms and risers, then share the PDF once you are back in signal.
  • Use the client’s words: rename Issue to Deficiency in the app, so the report matches the contract.
  • Leave the checklist section out of the report when the client wants only the deficiencies.

Every checklist here is free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.

The rest of the program

The other stages for facilities and maintenance teams.

  1. Planned and preventive maintenanceThis stage

    PPM checklists for HVAC, electrical, pumps and boilers, lifts and escalators, and the grounds and spaces you maintain.

    72checklists
  2. Health, safety and OSHA

    Workplace safety walk-rounds, OSHA self-inspections, fire and emergency checks, risk and environmental audits.

    58checklists
  3. Cleaning and hygiene

    Cleaning standards and audits for offices, washrooms, kitchens, classrooms, hospitals, hotels and retail centers.

    21checklists
  4. Workplace and office

    Office inspections, physical security reviews, process audits and water audits.

    10checklists
  5. Grounds, amenities and public spaces

    Front-of-house and public spaces: reception and host checks, parking areas and the spaces visitors use.

    4checklists

Questions people ask

How often should a planned and preventive maintenance checklist be done?

On the cycle your PPM schedule sets for this asset, which usually comes from the manufacturer, the contract or the insurer. The checklist records each visit; it doesn’t set the cycle.

Can the app schedule PPM visits?

Not yet. Automations for scheduling and reminders are on the roadmap. Today your PPM schedule says when a visit is due, and the checklist in the Easy Site Audit app records it.

Does a planned and preventive maintenance checklist replace a statutory inspection?

No. Where the law or an insurer requires a certified engineer’s inspection, the checklist doesn’t replace it. It records the planned maintenance your team does between those inspections.

What does the client see?

One PDF per visit with your logo: the answers, notes, photos and any action plans, signed on the cover. No watermark, and no app needed to read it.

Make the next walk-round the one nobody can question.

Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.

Start freeon iPhone and iPad
Start freeon iPhone and iPad