Sheet SS-029 · Site safety · Free template

Guardrail Inspection Checklist (free template)

Put the safety questions in front of the person doing the check: 31 questions in 4 sections, with a photo wherever proof matters.

Every shift starts with the checks done and the evidence on file.

What it covers

4 sections and 31 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: General
  2. Section 2: Longitudinal Guardrail
  3. Section 3: Terminals
  4. Section 4: Anchorage to Rigid Object
ChecklistGuardrail Inspection Checklist
StageSite safety
LaneBuilders and contractors
Sections4
Questions31
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Sep 26, 2024
PriceFree on every plan

When to use it

Use it whenever the structure is altered, moved or handed to a new trade. 31 questions gives a full picture of one job without turning it into a day’s work.

Its 4 sections (General, Longitudinal Guardrail, Terminals and Anchorage to Rigid Object) keep related questions together.

Who uses it

A competent person, often the scaffold supervisor or the site manager, completes it; every trade working on the structure relies on the result. The report goes to the site manager and the safety lead, and into the site file for audits and inspections.

Before you walk it

  • Inspect again after any alteration, and keep the reports in date order.
  • Photograph the scaffold tag or inspection record with each report.
  • Treat “No” as the start of an action, not the end of the check. Open an action plan, name who fixes it and set the due date before you walk on.
  • If something must not be used until it is fixed, set the priority to High and say so in the action plan, so nobody misreads the report.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Guardrail Inspection Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 4 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

How often should the Guardrail Inspection Checklist be done?

Before first use, at the interval your regulator and your site plan require, and after any event that could affect it, such as high winds or an alteration. Your plan sets the frequency; the checklist records each inspection.

Can the Guardrail Inspection Checklist be filled in without signal?

Yes. Once the checklist is added in the Easy Site Audit app, answering, photos and the report all work offline. You need a connection only to add checklists and to sync.

Can I change the questions in the Guardrail Inspection Checklist?

Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.

Start freeon iPhone and iPad
Start freeon iPhone and iPad