Sheet SS-040 · Site safety · Free template
Operational Readiness Checklist (construction) (free template)
The Operational Readiness Checklist (construction) turns a routine safety check into a dated record: 8 sections, 33 questions, and an owner for every defect.
Every shift starts with the checks done and the evidence on file.
What it covers
The Operational Readiness Checklist (construction) runs to 8 sections and 33 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Project Information
- Section 2: Documentation
- Section 3: Training
- Section 4: Environmental and Safety
- Section 5: Emergency Preparedness
- Section 6: Systems Testing
- Section 7: Start up Program
- Section 8: Observations
When to use it
Use it in the weeks before handover, while there is still time to close what it finds, and again on the day. 33 questions gives a full picture of one job without turning it into a day’s work.
The 8 sections run from Project Information to Observations, and the app’s Jump to section list takes you straight to any of them.
Who uses it
Project managers and site managers run it; the client, the operator or the facilities team receives it. Safety managers read it to see what was found and who is fixing it; the site file keeps it as the record of the check.
Before you walk it
- Agree the checklist with the client before the walk, so handover day has no surprises.
- Photograph meter readings, serial numbers and the keys handed over. They are the first things asked about later.
- Do the check where the work is. The checklist works with no signal, so a basement or an excavation is no reason to fill it in later.
- Duplicate the last project to start the next site, keeping its titles and its checklist, and change only what is different.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Operational Readiness Checklist (construction) in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.
Walk it
Work through the 8 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.
Questions people ask
What should a handover report include?
What was inspected, what was found, who owns each open item and when it is due, with photos and a signature. Easy Site Audit puts all of that in one PDF, with the checklist answers after the issues.
Can the Operational Readiness Checklist (construction) be filled in without signal?
Yes. Once the checklist is added in the Easy Site Audit app, answering, photos and the report all work offline. You need a connection only to add checklists and to sync.
Is the Operational Readiness Checklist (construction) free?
Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Run the next handover as a program, not a pile of PDFs.
Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.