Sheet SM-013 · Site management and daily · Free template
Pre-Start Checklist Construction (free template)
Fill it in on site, not at the end of the week: 10 sections, 30 questions, and up to 4 photos per question.
A dated record of every day on site, written on the day.
What it covers
The Pre-Start Checklist Construction runs to 10 sections and 30 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Project Planning and Assessment
- Section 2: Regulatory Compliance and Permits
- Section 3: Financial Planning
- Section 4: Project Team and Resources
- Section 5: Design and Documentation
- Section 6: Procurement and Supplier Management
- Section 7: Risk Assessment and Management
- Section 8: Stakeholder Communication
- Section 9: Logistics and Site Preparation
- Section 10: Technology and Tools
When to use it
Use it at the pre-use check and at the periodic inspection your plan or the manufacturer sets. 30 questions makes a focused inspection: long enough to cover the job properly, short enough to finish in one visit.
The 10 sections run from Project Planning and Assessment to Technology and Tools, and the app’s Jump to section list takes you straight to any of them.
Who uses it
Operators and fitters use it; the site manager and the hire company receive the defects. Clients get a dated report with photos; the commercial team keeps it for change orders and delay claims.
Before you walk it
- If a defect means the machine must not be used, set High priority and say so in the action plan.
- Use the arrow on photos to point at leaks, wear and damage for the fitter.
- Keep housekeeping findings small and specific: one item per hazard, each with its own photo and owner.
- Name each project with the site and the date, so a search by title finds any day of the job.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Pre-Start Checklist Construction in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.
Walk it
Work through the 10 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.
Questions people ask
Who should complete the Pre-Start Checklist Construction?
The operator before use, and a competent person at the periodic inspections your plan sets. The site manager reviews the defects.
Can I add my own questions to the Pre-Start Checklist Construction?
Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list, for anything the checklist doesn’t ask.
Is the Pre-Start Checklist Construction free?
Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Run the next handover as a program, not a pile of PDFs.
Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.