What the site management and daily stage involves
Disputes about delays, damage and change orders are settled by what was written down on the day. A daily report filled in from memory on Friday is worth very little. One written on site at five o’clock, with photos, is worth a great deal.
The checklists here cover the routine of a site: the field or daily report, the pre-start check, the housekeeping walk, and the builders’ clean that turns a finished building into one a client will accept. They are built to be repeated, so the habit sticks.
Keep each day’s check as its own project, named with the site and the date. Over a job, the reports become the site diary: each one signed and dated, with the photos that show what the site looked like.
How this stage runs
Start of day
Pre-start checks before work begins: access, plant, welfare and the day’s hazards.
During the day
Housekeeping walks and field observations, with photos of what you found.
End of day
The daily or field report: who was on site, what was done, and what held the work up.
Before handover
The post-construction clean, checked room by room before the client walks.
13 site management and daily checklists
Every site management and daily checklist in the library, A to Z. Each page shows its sections, its size and when to use it.
- Site management and dailyA3 Report Format
- Site management and dailyAerial Lift Inspection Checklist
- Site management and dailyAfter Builders Cleaning Checklist
- Site management and dailyBathroom Cleaning SOP Checks
- Site management and dailyConstruction Field Report Template
- Site management and dailyConstruction Site Housekeeping Checklist
- Site management and dailyContractor Daily Report Template
- Site management and dailyDrill Machine Inspection Checklist
- Site management and dailyField Service Report Form
- Site management and dailyGeneral Cleaning Checklist
- Site management and dailyPost Construction Cleaning Checklist Template
- Site management and dailyPre-Cleaning Survey
- Site management and dailyPre-Start Checklist Construction
Practical points for this stage
- Write the report before you leave the site. The details you remember at five o’clock are gone by the next morning.
- Take a wide photo of each area from the same spot each day. A run of them shows progress better than any description.
- Note the weather and who was on site. They are the first things asked about in a delay claim.
- Use color tags for trades or areas, so the items in the report group the way your team works.
- Keep housekeeping findings small and specific: one item per hazard, each with its own photo and owner.
- Name each project with the site and the date, so a search by title finds any day of the job.
Every checklist here is free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.
The rest of the program
The other stages for builders and contractors.
- Handover and closeoutStart here20checklists
The pre-handover walk, the punch list, the re-inspection and the final sign-off.
- Quality and trades48checklists
Trade-by-trade quality checks: pre-pour, framing, rough-in, pre-drywall, roofing, waterproofing and commissioning.
- Site safety58checklists
Pre-use plant and tool checks, scaffold and lifting inspections, risk assessments and site safety audits.
- Site management and dailyThis stage13checklists
Daily and field reports, pre-start checks, housekeeping walks and the clean before handover.
Questions people ask
Should a site management and daily checklist be filled in every day?
If it records the site’s routine, yes. The value is in the unbroken run of dated reports; a gap is the day someone will ask about.
Can a site management and daily checklist be used as a site diary?
It can form part of one. Each completed checklist becomes a dated PDF with photos and your signature; kept together, they are a day-by-day record of the site.
Can I add my own questions to a site management and daily checklist?
Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list, for anything the checklist doesn’t ask.
Run the next handover as a program, not a pile of PDFs.
Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.