What it covers

10 sections and 50 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Asset Records and Service History
  2. Section 2: Roof Access and Safety
  3. Section 3: Roof Curb and Mounting
  4. Section 4: Cabinet and Filters
  5. Section 5: Supply Fan, Evaporator, and Condensate
  6. Section 6: Condenser and Refrigerant Circuit
  7. Section 7: Economizer and Outside Air
  8. Section 8: Gas Heat Section
  9. Section 9: Electrical and Controls
  10. Section 10: Performance Verification
ChecklistRTU Maintenance Checklist for Rooftop Units
StagePlanned and preventive maintenance
LaneFacilities and maintenance teams
Sections10
Questions50
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Sep 10, 2026
PriceFree on every plan

When to use it

Use it when you take over the building, to record each unit’s condition before you are responsible for it. 50 questions makes a thorough walk. Answers save on the device as you go, so a break in the middle loses nothing.

The 10 sections run from Asset Records and Service History to Performance Verification, and the app’s Jump to section list takes you straight to any of them.

Who uses it

HVAC technicians and maintenance engineers complete it; the facilities or property manager reviews the defects. The report goes to the client’s facilities manager and into the asset’s maintenance record.

Before you walk it

  • Photograph filters before and after changing them.
  • Photograph the rating plate first: make, model and serial number tie the report to the unit.
  • Title each project with the site, the asset and the visit date, so the history of one asset is one search away.
  • Work offline in plant rooms and risers, then share the PDF once you are back in signal.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the RTU Maintenance Checklist for Rooftop Units in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 10 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.

Questions people ask

How often should the RTU Maintenance Checklist for Rooftop Units be done?

On the service cycle the manufacturer and your maintenance plan set for this equipment, and after any fault. The checklist records each service; it doesn’t set the cycle.

Can the app schedule PPM visits?

Not yet. Automations for scheduling and reminders are on the roadmap. Today your PPM schedule says when a visit is due, and the checklist in the Easy Site Audit app records it.

Is the RTU Maintenance Checklist for Rooftop Units free?

Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Make the next walk-round the one nobody can question.

Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.

Start freeon iPhone and iPad
Start freeon iPhone and iPad