Sheet PM-067 · Planned and preventive maintenance · Free template

Split AC Maintenance Checklist (free template)

Work through the asset in the same order every visit: 59 questions across 9 sections, signed and filed as a PDF.

Every PPM task done, signed and on file before the client asks.

What it covers

9 sections and 59 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Asset Records and Service History
  2. Section 2: Safety and Isolation
  3. Section 3: Indoor Unit
  4. Section 4: Condensate and Drainage
  5. Section 5: Outdoor Unit
  6. Section 6: Electrical and Controls
  7. Section 7: Refrigerant Circuit and Pipework
  8. Section 8: Performance Verification
  9. Section 9: Annual Service Tasks
ChecklistSplit AC Maintenance Checklist
StagePlanned and preventive maintenance
LaneFacilities and maintenance teams
Sections9
Questions59
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Sep 10, 2026
PriceFree on every plan

When to use it

Use it at each planned service, and before the season the system works hardest in. 59 questions makes a thorough walk. Answers save on the device as you go, so a break in the middle loses nothing.

9 sections, from Asset Records and Service History through to Annual Service Tasks. The app shows the page you are on and how many are left as you go.

Who uses it

HVAC technicians and maintenance engineers complete it; the facilities or property manager reviews the defects. Clients read it at the monthly or quarterly review; contract managers use it to show the SLA was met.

Before you walk it

  • Type readings (temperatures, pressures, currents) into the number answers where the checklist asks, so the next service can compare.
  • Photograph filters before and after changing them.
  • Work offline in plant rooms and risers, then share the PDF once you are back in signal.
  • Use the client’s words: rename Issue to Deficiency in the app, so the report matches the contract.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Split AC Maintenance Checklist in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 9 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.

Questions people ask

How often should the Split AC Maintenance Checklist be done?

On the service cycle the manufacturer and your maintenance plan set for this equipment, and after any fault. The checklist records each service; it doesn’t set the cycle.

What does the client see?

One PDF per visit with your logo: the answers, notes, photos and any action plans, signed on the cover. No watermark, and no app needed to read it.

Does the Split AC Maintenance Checklist work offline?

Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.

Make the next walk-round the one nobody can question.

Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.

Start freeon iPhone and iPad
Start freeon iPhone and iPad