Sheet PM-070 · Planned and preventive maintenance · Free template
Switchgear Maintenance Checklist (free template)
The Switchgear Maintenance Checklist gives every technician the same order of work: 1 section, 23 questions, and an owner for each deficiency.
Every PPM task done, signed and on file before the client asks.
What it covers
1 section and 23 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: General inspection
When to use it
Use it at each planned inspection or maintenance visit, with the equipment isolated where your procedure requires it. At 23 questions, plan it as one sitting on site, not a quick tick on the way past.
It is a single section, General inspection: start at the top and work down.
Who uses it
Qualified electricians and electrical maintenance engineers complete it; the facilities manager owns the defects. Clients read it at the monthly or quarterly review; contract managers use it to show the SLA was met.
Before you walk it
- The checklist is not your safe system of work: isolate and test as your procedure requires before you start.
- Photograph panel schedules, labels and rating plates. They are what the next engineer needs.
- Where the checklist asks for a reading, type the number in, so the next visit can compare.
- Raise each deficiency as an action plan with the contractor, a priority and a due date. Open work stays visible until it is completed.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Switchgear Maintenance Checklist in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.
Walk it
Work down the questions in order. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.
Questions people ask
Does the Switchgear Maintenance Checklist replace an electrical certificate?
No. Where an electrical certificate or a licensed inspection is required, only a qualified person can issue it. The checklist is the structured record of your inspection or maintenance.
Does the Switchgear Maintenance Checklist replace a statutory inspection?
No. Where the law or an insurer requires a certified engineer’s inspection, the checklist doesn’t replace it. It records the planned maintenance your team does between those inspections.
Can I change the questions in the Switchgear Maintenance Checklist?
Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.
Make the next walk-round the one nobody can question.
Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.