Sheet PM-001 · Planned and preventive maintenance · Free template
AHU Service Checklist (free template)
A ready-made PPM checklist: 9 sections and 46 questions for one visit, with up to 4 photos per question as evidence the work was done.
Every PPM task done, signed and on file before the client asks.
What it covers
The AHU Service Checklist runs to 9 sections and 46 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Safety and Isolation
- Section 2: Filters
- Section 3: Fan and Motor
- Section 4: Belts and Pulleys (Belt-drive units)
- Section 5: Coils
- Section 6: Condensate Drainage
- Section 7: Dampers and Actuators
- Section 8: Electrical and Controls
- Section 9: Housekeeping and Reinstatement
When to use it
Use it at each planned service, and before the season the system works hardest in. At 46 questions, this is a full inspection. Set time aside for it and walk it in the checklist’s order.
The 9 sections run from Safety and Isolation to Housekeeping and Reinstatement, and the app’s Jump to section list takes you straight to any of them.
Who uses it
HVAC technicians and maintenance engineers complete it; the facilities or property manager reviews the defects. The report goes to the client’s facilities manager and into the asset’s maintenance record.
Before you walk it
- Photograph the rating plate first: make, model and serial number tie the report to the unit.
- Type readings (temperatures, pressures, currents) into the number answers where the checklist asks, so the next service can compare.
- Photograph the asset tag or rating plate first, so the report is tied to one asset.
- Where the checklist asks for a reading, type the number in, so the next visit can compare.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the AHU Service Checklist in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.
Walk it
Work through the 9 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.
Questions people ask
How often should the AHU Service Checklist be done?
On the service cycle the manufacturer and your maintenance plan set for this equipment, and after any fault. The checklist records each service; it doesn’t set the cycle.
Can the app schedule PPM visits?
Not yet. Automations for scheduling and reminders are on the roadmap. Today your PPM schedule says when a visit is due, and the checklist in the Easy Site Audit app records it.
Is the AHU Service Checklist free?
Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Make the next walk-round the one nobody can question.
Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.