Sheet PM-038 · Planned and preventive maintenance · Free template
MCC Maintenance Checklist (free template)
9 sections, 46 questions, and an action plan on every deficiency, so the PPM record shows what was done and what is still open.
Every PPM task done, signed and on file before the client asks.
What it covers
9 sections and 46 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Safety and Isolation
- Section 2: Enclosure and General Condition
- Section 3: Busbars and Connections
- Section 4: Circuit Breakers and Fuses
- Section 5: Contactors and Starters
- Section 6: Overload Relays
- Section 7: Wiring and Terminations
- Section 8: Controls, Metering, and Indication
- Section 9: Documentation and Reinstatement
When to use it
Use it before new or altered equipment is energized and handed over. At 46 questions, this is a full inspection. Set time aside for it and walk it in the checklist’s order.
9 sections, from Safety and Isolation through to Documentation and Reinstatement. The app shows the page you are on and how many are left as you go.
Who uses it
Qualified electricians and electrical maintenance engineers complete it; the facilities manager owns the defects. Facilities managers read it to see what is open; auditors and insurers ask for it later.
Before you walk it
- Photograph panel schedules, labels and rating plates. They are what the next engineer needs.
- Type readings into the number answers where the checklist asks for them.
- Photograph the asset tag or rating plate first, so the report is tied to one asset.
- Where the checklist asks for a reading, type the number in, so the next visit can compare.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the MCC Maintenance Checklist in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.
Walk it
Work through the 9 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.
Questions people ask
Does the MCC Maintenance Checklist replace an electrical certificate?
No. Where an electrical certificate or a licensed inspection is required, only a qualified person can issue it. The checklist is the structured record of your inspection or maintenance.
Does the MCC Maintenance Checklist replace a statutory inspection?
No. Where the law or an insurer requires a certified engineer’s inspection, the checklist doesn’t replace it. It records the planned maintenance your team does between those inspections.
Does the MCC Maintenance Checklist work offline?
Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.
Make the next walk-round the one nobody can question.
Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.