Sheet PM-006 · Planned and preventive maintenance · Free template
Building Exterior Maintenance Checklist (free template)
A ready-made PPM checklist: 2 sections and 10 questions for one visit, with up to 4 photos per question as evidence the work was done.
Every PPM task done, signed and on file before the client asks.
What it covers
10 questions across 2 sections. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Grounds
- Section 2: Exterior Building
When to use it
Use it on a planned cycle, often in spring and fall, and after every major storm. With 10 questions, it fits between other work, so there is no reason to fill it in later.
The 2 sections split the job into Grounds and Exterior Building. Property managers use it too, for the same job across their buildings.
Who uses it
Roofers, building surveyors and property managers complete it; owners and insurers receive the report. The report goes to the client’s facilities manager and into the asset’s maintenance record.
Before you walk it
- Photograph from the safest point you can. Photos from a pole camera or a drone can be added from the photo library afterwards.
- Mark cracks, splits and lifted edges on the photo with the arrow and the measure tool.
- Leave the checklist section out of the report when the client wants only the deficiencies.
- Photograph the asset tag or rating plate first, so the report is tied to one asset.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Building Exterior Maintenance Checklist in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.
Walk it
Work through the 2 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.
Questions people ask
How often should the Building Exterior Maintenance Checklist be done?
On the cycle your maintenance plan or insurer sets, and after storms or any leak. The checklist records each inspection; the cycle is yours.
Can the app schedule PPM visits?
Not yet. Automations for scheduling and reminders are on the roadmap. Today your PPM schedule says when a visit is due, and the checklist in the Easy Site Audit app records it.
Is the Building Exterior Maintenance Checklist free?
Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Make the next walk-round the one nobody can question.
Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.