What it covers
13 questions across 1 section. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Lockout Tagout
When to use it
Use it before an external inspection or audit, so the findings are yours first. At 13 questions, it is short enough to run every time it is due, which is the point: a check that is quick gets done.
It is a single section, Lockout Tagout: start at the top and work down.
Who uses it
Safety advisers and supervisors walk it; the teams it covers fix what it finds. Clients read it at the monthly or quarterly review; contract managers use it to show the SLA was met.
Before you walk it
- Open an action plan for every hazard before you move on.
- Walk the area again with the same checklist when the actions are due.
- Raise each deficiency as an action plan with the contractor, a priority and a due date. Open work stays visible until it is completed.
- Title each project with the site, the asset and the visit date, so the history of one asset is one search away.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the OSHA Lockout Tagout (LOTO ) Inspection Checklist in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.
Walk it
Work down the questions in order. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.
Questions people ask
How often should the OSHA Lockout Tagout (LOTO ) Inspection Checklist be done?
On the cycle your PPM schedule sets for this asset, which usually comes from the manufacturer, the contract or the insurer. The checklist records each visit; it doesn’t set the cycle.
Can the app schedule PPM visits?
Not yet. Automations for scheduling and reminders are on the roadmap. Today your PPM schedule says when a visit is due, and the checklist in the Easy Site Audit app records it.
Does the OSHA Lockout Tagout (LOTO ) Inspection Checklist work offline?
Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.
Make the next walk-round the one nobody can question.
Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.