Electrical Preventive Maintenance Checklist (free template)
One PPM visit, one record: 31 questions across 15 sections, photographed, signed and ready for the client review.
Every PPM task done, signed and on file before the client asks.
What it covers
The Electrical Preventive Maintenance Checklist runs to 15 sections and 31 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Visual Inspection
- Section 2: Circuit Breakers and Fuses
- Section 3: Power Supply Systems
- Section 4: Electrical Panels and Distribution Boards
- Section 5: Protective Devices
- Section 6: Lighting Systems
- Section 7: Wiring and Cables
- Section 8: Motors and Pumps
- Section 9: HVAC Systems
- Section 10: Battery Systems
- Section 11: Grounding Systems
- Section 12: Environmental Check
- Section 13: Record Keeping and Documentation
- Section 14: Safety and Compliance
- Section 15: Professional Inspections
When to use it
Use it before new or altered equipment is energized and handed over. At 31 questions, plan it as one sitting on site, not a quick tick on the way past.
15 sections cover a lot of ground, from Visual Inspection to Professional Inspections. Walk them in order, or jump to the one you are standing in.
Who uses it
Qualified electricians and electrical maintenance engineers complete it; the facilities manager owns the defects. The report goes to the client’s facilities manager and into the asset’s maintenance record.
Before you walk it
- The checklist is not your safe system of work: isolate and test as your procedure requires before you start.
- Photograph panel schedules, labels and rating plates. They are what the next engineer needs.
- Title each project with the site, the asset and the visit date, so the history of one asset is one search away.
- Work offline in plant rooms and risers, then share the PDF once you are back in signal.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Electrical Preventive Maintenance Checklist in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.
Walk it
Work through the 15 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.
Questions people ask
Does the Electrical Preventive Maintenance Checklist replace an electrical certificate?
No. Where an electrical certificate or a licensed inspection is required, only a qualified person can issue it. The checklist is the structured record of your inspection or maintenance.
How often should the Electrical Preventive Maintenance Checklist be done?
On the cycle your PPM schedule sets for this asset, which usually comes from the manufacturer, the contract or the insurer. The checklist records each visit; it doesn’t set the cycle.
Does the Electrical Preventive Maintenance Checklist work offline?
Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.
Make the next walk-round the one nobody can question.
Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.