Sheet PM-032 · Planned and preventive maintenance · Free template
Generator Inspection Checklist (free template)
Work through the asset in the same order every visit: 29 questions across 4 sections, signed and filed as a PDF.
Every PPM task done, signed and on file before the client asks.
What it covers
4 sections and 29 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: General
- Section 2: Weekly
- Section 3: Monthly
- Section 4: Annual
When to use it
Use it before new or altered equipment is energized and handed over. 29 questions makes a focused inspection: long enough to cover the job properly, short enough to finish in one visit.
Its 4 sections (General, Weekly, Monthly and Annual) keep related questions together.
Who uses it
Qualified electricians and electrical maintenance engineers complete it; the facilities manager owns the defects. Clients read it at the monthly or quarterly review; contract managers use it to show the SLA was met.
Before you walk it
- Photograph panel schedules, labels and rating plates. They are what the next engineer needs.
- Type readings into the number answers where the checklist asks for them.
- Leave the checklist section out of the report when the client wants only the deficiencies.
- Photograph the asset tag or rating plate first, so the report is tied to one asset.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Generator Inspection Checklist in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.
Walk it
Work through the 4 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.
Questions people ask
Does the Generator Inspection Checklist replace an electrical certificate?
No. Where an electrical certificate or a licensed inspection is required, only a qualified person can issue it. The checklist is the structured record of your inspection or maintenance.
What does the client see?
One PDF per visit with your logo: the answers, notes, photos and any action plans, signed on the cover. No watermark, and no app needed to read it.
Can I change the questions in the Generator Inspection Checklist?
Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.
Make the next walk-round the one nobody can question.
Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.