Sheet PM-041 · Planned and preventive maintenance · Free template
NFPA 25 Fire Pump Inspection (free template)
A ready-made PPM checklist: 16 sections and 100 questions for one visit, with up to 4 photos per question as evidence the work was done.
Every PPM task done, signed and on file before the client asks.
What it covers
16 sections and 100 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Fire Pump Inspections
- Section 2: Fire Pump System
- Section 3: Electrical System Condition
- Section 4: Diesel Engine System Conditions
- Section 5: Steam System Conditions
- Section 6: Pump System
- Section 7: Electrical System
- Section 8: Diesel Engine System
- Section 9: Fire Pump Tests
- Section 10: Fire Pump Maintenace (NFPA 25: 8.5.1)
- Section 11: Mechanical Transmission
- Section 12: Lubrication System
- Section 13: Cooling System
- Section 14: Exhaust System
- Section 15: Battery System
- Section 16: Electrical System(Maintenance)
When to use it
Use it at each routine test, so the record shows every device was checked, not just the panel. At 100 questions, this is a full inspection. Set time aside for it and walk it in the checklist’s order.
With 16 sections, from Fire Pump Inspections to Electrical System(Maintenance), use the app’s Jump to section list rather than scrolling.
Who uses it
In-house maintenance teams run the routine checks; licensed contractors handle the tests your code reserves for them. The report goes to the client’s facilities manager and into the asset’s maintenance record.
Before you walk it
- Record any device that fails a test as High priority, with an action plan and a due date.
- Keep the reports in date order. The run of tests is the record an inspector asks for.
- Work offline in plant rooms and risers, then share the PDF once you are back in signal.
- Use the client’s words: rename Issue to Deficiency in the app, so the report matches the contract.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the NFPA 25 Fire Pump Inspection in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.
Walk it
Work through the 16 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.
Questions people ask
Does the NFPA 25 Fire Pump Inspection meet fire code requirements?
It records the checks; it doesn’t certify compliance. Your local fire code, the authority having jurisdiction and your insurer set what must be tested, how often and by whom.
Can the app schedule PPM visits?
Not yet. Automations for scheduling and reminders are on the roadmap. Today your PPM schedule says when a visit is due, and the checklist in the Easy Site Audit app records it.
Can I change the questions in the NFPA 25 Fire Pump Inspection?
Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.
Make the next walk-round the one nobody can question.
Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.