Sheet PM-058 · Planned and preventive maintenance · Free template
Residential Electrical Inspection Checklist (free template)
19 sections, 127 questions, and an action plan on every deficiency, so the PPM record shows what was done and what is still open.
Every PPM task done, signed and on file before the client asks.
What it covers
19 sections and 127 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Documentation Review
- Section 2: Service Panel and Main Disconnect
- Section 3: Wiring and Conductors
- Section 4: Receptacles and Outlets
- Section 5: AFCI Protection
- Section 6: Dedicated Circuits
- Section 7: Lighting
- Section 8: Smoke and CO Detectors
- Section 9: Outdoor and Exterior Electrical
- Section 10: Garage and Basement
- Section 11: Documentation and Pre-inspection Checks
- Section 12: Enclosure and Physical Condition
- Section 13: Busbars and Internal Components
- Section 14: Circuit Breakers and Protective Devices
- Section 15: RCD and RCBO Testing
- Section 16: Earthing and Bonding
- Section 17: Cable Entries and Terminations
- Section 18: Circuit Schedule and Labeling
- Section 19: Thermal and Operational Checks
When to use it
Use it on the cycle your maintenance plan or insurer sets, and after any fault, trip or alteration. At 127 questions, this is a major inspection, best planned as its own visit. Answers save on the device as you go, so you can stop and pick it up again.
19 sections cover a lot of ground, from Documentation Review to Thermal and Operational Checks. Walk them in order, or jump to the one you are standing in.
Who uses it
Electrical contractors and in-house engineers use it; clients and insurers receive the report. Facilities managers read it to see what is open; auditors and insurers ask for it later.
Before you walk it
- Photograph panel schedules, labels and rating plates. They are what the next engineer needs.
- Type readings into the number answers where the checklist asks for them.
- Leave the checklist section out of the report when the client wants only the deficiencies.
- Photograph the asset tag or rating plate first, so the report is tied to one asset.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Residential Electrical Inspection Checklist in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.
Walk it
Work through the 19 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.
Questions people ask
Does the Residential Electrical Inspection Checklist replace an electrical certificate?
No. Where an electrical certificate or a licensed inspection is required, only a qualified person can issue it. The checklist is the structured record of your inspection or maintenance.
Can the app schedule PPM visits?
Not yet. Automations for scheduling and reminders are on the roadmap. Today your PPM schedule says when a visit is due, and the checklist in the Easy Site Audit app records it.
Can I change the questions in the Residential Electrical Inspection Checklist?
Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.
Make the next walk-round the one nobody can question.
Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.