Welding Checklist for Construction - OSHA (free template)
Check the trade’s work at the hold point, not at handover. 14 sections and 34 questions, free in the Easy Site Audit app.
Fewer items on the punch list, because they were caught at the trade.
What it covers
34 questions across 14 sections. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Transporting, Moving, and Storing Compressed Gas Cylinders
- Section 2: Placing Cylinders
- Section 3: Treatment of Cylinders
- Section 4: Use of Fuel Gas
- Section 5: Fuel Gas and Oxygen Manifolds
- Section 6: Hoses
- Section 7: Torches
- Section 8: Regulators and Gauges
- Section 9: Oil and Grease Hazards
- Section 10: Welding Cables and Connectors
- Section 11: Operating Instructions
- Section 12: Fire Prevention
- Section 13: Ventilation and Protection
- Section 14: Preservative Coatings
When to use it
Use it before the tool is issued or used, and at the regular inspection your site sets for portable equipment. At 34 questions, plan it as one sitting on site, not a quick tick on the way past.
14 sections cover a lot of ground, from Transporting, Moving, and Storing Compressed Gas Cylinders to Preservative Coatings. Walk them in order, or jump to the one you are standing in.
Who uses it
Tool store managers, supervisors and the operators themselves complete it; the safety lead reviews the defects. Project managers use the report to release the next trade; the quality file keeps it for closeout.
Before you walk it
- Photograph each tool’s ID or serial number with the defect.
- Take damaged tools out of use and say so in the action plan.
- Agree the hold points with each trade at the start, so nobody covers work that hasn’t been checked.
- Where the checklist asks for a reading or a measurement, type the number in. It prints in the report beside the question.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Welding Checklist for Construction - OSHA in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.
Walk it
Work through the 14 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.
Questions people ask
How often should tools be checked with the Welding Checklist for Construction - OSHA?
Before each use by the operator, and on the regular cycle your site or company sets for portable equipment. The checklist records each check; your plan sets the cycle.
Does completing the checklist mean the work meets code?
No. The checklist records what was inspected and what was found, with photos. Code approval comes from the building inspector or the engineer of record; the report is your evidence of the checks you made.
Is the Welding Checklist for Construction - OSHA free?
Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Run the next handover as a program, not a pile of PDFs.
Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.