Builders and contractors · Stage QT

Quality and trades checklists

Checklists for the hold points of a build: pre-pour, framing, rough-in, pre-drywall, the envelope and commissioning. Check each trade’s work while it can still be seen and fixed.

Fewer items on the punch list, because they were caught at the trade.

Stage
Quality and trades
Checklists
48
Lane
Builders and contractors
Price
Free on every plan

What the quality and trades stage involves

Every punch item had an earlier, cheaper moment when it could have been caught. A missing nail plate is a quick fix before drywall and a ceiling repair after it. Quality checklists sit at those moments: the hold points where one trade’s work is about to be covered by the next.

Run them trade by trade. The concrete check before the pour, the framing check before sheathing, the rough-in check before insulation and the pre-drywall walk before the boards go up. Commissioning checklists then show that each system runs before it is handed over.

A photo at each hold point is worth more than the tick beside it. When a question comes up months later about what is inside a wall, the report shows it.

How this stage runs

  1. Before the pour

    Check formwork, reinforcement, cover and embedded items, and photograph them before the concrete truck arrives.

  2. Before it’s covered

    Framing, rough-in and pre-drywall checks catch what the next trade will hide. Photograph every cavity you sign off.

  3. Envelope and roof

    Waterproofing and roof checks while access is still easy, before the scaffold comes down.

  4. Commissioning

    Show that each system runs, record the readings and file the report with the closeout documents.

48 quality and trades checklists

Every quality and trades checklist in the library, A to Z. Each page shows its sections, its size and when to use it.

Practical points for this stage

  • Photograph every cavity before it is closed, even when it is right. The photo of a correct install is the one you will need later.
  • Agree the hold points with each trade at the start, so nobody covers work that hasn’t been checked.
  • Where the checklist asks for a reading or a measurement, type the number in. It prints in the report beside the question.
  • Open an action plan on every answer that needs fixing, with a due date, so the re-check happens before the next trade arrives.
  • Draw a dimension line on the photo with the measure tool, so the trade sees the size of the gap, not just the word “gap”.
  • Re-inspect with the same checklist and keep both reports. Together they show the defect and the fix.

Every checklist here is free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

The rest of the program

The other stages for builders and contractors.

  1. Handover and closeoutStart here

    The pre-handover walk, the punch list, the re-inspection and the final sign-off.

    20checklists
  2. Quality and tradesThis stage

    Trade-by-trade quality checks: pre-pour, framing, rough-in, pre-drywall, roofing, waterproofing and commissioning.

    48checklists
  3. Site safety

    Pre-use plant and tool checks, scaffold and lifting inspections, risk assessments and site safety audits.

    58checklists
  4. Site management and daily

    Daily and field reports, pre-start checks, housekeeping walks and the clean before handover.

    13checklists

Questions people ask

When in the build is a quality and trades checklist used?

At the hold point for this work: once the trade says it is ready and before anything covers it. Used later, it checks finished surfaces instead of the work itself.

Who should fill in a quality and trades checklist?

Whoever your project names to sign off this stage: usually the superintendent, the site manager or a quality manager. Some teams have the trade’s foreman run it first as a self-check.

Does completing the checklist mean the work meets code?

No. The checklist records what was inspected and what was found, with photos. Code approval comes from the building inspector or the engineer of record; the report is your evidence of the checks you made.

How does a trade contractor get their items?

Send them the PDF report. Each item carries its photos and its action plan, with the priority and the due date. A shared team workspace is on the roadmap; today the report is how the trade gets the list.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.

Start freeon iPhone and iPad
Start freeon iPhone and iPad