A construction quality control checklist only earns its keep if a failed check reaches the trade before the work is covered. Easy Site Audit runs QC inspections at each hold point from ready-made checklists, with photos on the question, an action plan for every failure, and the re-inspection on record before the next trade starts.

Nothing gets covered until it has been checked, fixed and photographed.

SheetCI-02

TitleQuality control

For
Builders and contractors
Sheet type
Use case
Words
US English: punch item, closeout, retainage
Revised
20 Oct 2026

A pre-drywall hold point on Level 3

How one failed check travels from the walk to the release.

  1. FindingHarlow Street, Building 2, Level 3. Two days before the drywall crew arrives, the superintendent walks units 3.01 to 3.08 against a pre-drywall checklist. In 3.06 a drain line runs through a stud with no protective plate. The question gets a No, two photos and a note.
  2. OwnedThe action plan goes to the plumbing foreman: plate the bore in 3.06 and check the rest of the stack. Priority High, due Wednesday. The foreman has the marked-up photo before lunch.
  3. FixedWednesday afternoon the superintendent re-inspects 3.06 and the units above and below it, adds the after photos, and moves the action plan to Completed.
  4. Handed overLevel 3 is released to the drywall crew on Thursday, as booked. The signed PDF, with the first photo, the action plan and the fix, goes to the project manager and into the QC file.
Illustration. Places, people and numbers are fictional.Easy Site Audit

Why quality control lives at the hold points

Most quality failures are cheap at one moment and expensive at every moment after it. A missing nail plate is ten minutes for the plumber before drywall and a ceiling repair after. Rebar cover is a tape measure before the pour and a core drill after. That is why a QC plan sets hold points: the work stops until someone has inspected it and released it.

Getting the checklist right is the easy part. Failures happen between the inspection and the release: a No that nobody acted on, a fix that was never checked, a photo that lives on one person’s phone. Easy Site Audit keeps each of those in the same project, against the question that raised it.

Be clear about what that means. The platform records the inspection; it doesn’t stop the work. Nothing locks a crew out of a wall. What you get is a signed record of what was checked, what failed, who fixed it and when it was checked again, which is what you release the work against.

Running QC inspections in Easy Site Audit

  1. One project per hold point

    Create a project for each inspection stage, such as “Building 2, Level 3, pre-drywall”, and attach the matching checklist. A project holds one checklist, and it keeps the version it started with, so the record always matches what you inspected.

  2. Evidence on the question

    Answer Yes, No or N/A, enter a reading where the checklist asks for a number, and attach photos and a note to the question itself. The evidence sits next to the check it proves, in the app and in the PDF.

  3. An action plan for every failure

    On an answer that needs action, write what needs fixing, pick the trade’s contact as the assignee, and set the priority and a due date. The phone number travels with the action plan.

  4. Re-inspect before release

    Walk the failed checks again, add the after photo, and move the action plan to Completed. Anything not ready stays open, with a note that says why.

  5. Copy the setup to Level 4

    Duplicate the project for Level 4 and choose to copy the checklist, titles and assignees but not the photos. Every floor is checked the same way, whoever walks it.

What a QC checklist should cover

The usual hold points on a residential or mixed-use build, in plain words. The checklist you pick sets the actual questions.

Before the pour

  • Formwork on line and level, braced and clean
  • Rebar size, spacing, laps and cover, with chairs in place
  • Embeds, sleeves and penetrations located and fixed
  • Required sign-offs in hand before the truck is called

Before drywall

  • Framing, blocking and backing where fixtures will hang
  • Plumbing, electrical and HVAC rough-in complete and tested
  • Protective plates where pipe and cable pass through studs
  • Firestopping at penetrations; insulation and vapor control in place

Waterproofing

  • Substrate clean, dry and sloped to the drain
  • Membrane laps, upturns and corners detailed
  • Flood test held and recorded before tile
  • Flashing at windows, doors and penetrations

Finishes

  • Paint coverage, cut-in lines and touch-ups
  • Sealant at tubs, showers, counters and trim
  • Doors swing, latch and close without binding
  • Tile lippage, grout lines and trim alignment

Questions people ask

Can I attach photos to a specific checklist question?

Yes. Each question takes 2 or 4 photos, set by the checklist, plus one note. The photos and the note print with that question in the PDF, so the evidence for a failed check sits next to the check itself.

Can a failed check stop the next trade from starting?

No. Easy Site Audit records inspections; it doesn’t lock work or enforce a hold point. The action plan, the re-inspection photo and the Completed status give you the record you release the work against.

Does the report give the inspection a single result?

No. The answers aren’t totaled into one result. The PDF shows each answer with its points, each section’s completion percentage, the notes and photos, and the comments and action plan for each answer that needs one.

Can I use our own QC checklist?

Not today. Checklists can’t be written or edited in the app. Pick the closest ready-made checklist, mark questions that don’t apply as N/A, and log anything else as a photo item in the same project.

Run the next handover as a program, not a pile of PDFs.

Start freeon iPhone and iPad
Start freeon iPhone and iPad