Facilities · Use case

Building walk-round inspections

A building walk-round checklist keeps the route and the questions the same every time, so a fire door that stopped closing or a new leak stands out against last month. Easy Site Audit runs the walk-round in the field app on iPhone and iPad, and ends it in a signed PDF the client can read.

Same route, same questions, every deficiency owned and closed with a photo.

SheetFI-03

TitleBuilding walk-rounds

For
Facilities teams
Sheet type
Use case
Words
Walk-round, deficiency, PPM, SLA
Revised
20 Oct 2026

Why the route matters more than the form

A walk-round is a comparison. You are looking for what changed since the last one: the door that no longer latches, the stain that wasn’t on the ceiling, the boxes that have crept into the mechanical room. That only works if you walk the same way every time, roof to basement or the reverse, the same doors in the same order.

When the route drifts, things drop out: the roof hatch skipped in the rain, the plant room given a glance through the door. A ready-made checklist that follows the building (roof, parking, windows and doors, electrical, plumbing, elevators, security, fire equipment) holds the route for you, and the questions are already written when you step out of the stairwell.

This is one part of facility inspection software for FM contractors and in-house teams. Plant servicing has its own page: planned preventive maintenance inspections.

Westfield Learning Campus: the October walk-round

A school campus with three buildings: the main block, the science block and the gym, looked after by an in-house site team with contractors on call.

  1. FoundJo starts at the top of the science block and works down. The fire door to the lab corridor stops a hand’s width short of the frame. Jo answers No and takes four photos of the gap.
  2. OwnedThe action plan goes to the door contractor from Jo’s contacts: adjust or replace the closer, priority High, due in three days.
  3. Logged offlineIn the gym, a ceiling tile has stained brown under a pipe run. Jo photographs it, draws an arrow along the drip line and writes the plumbing contractor into Assigned To. The boiler room below has no signal; the walk carries on offline.
  4. Re-inspectedTwo days later Jo walks the science block again. The closer is new and the door latches. Jo adds an after photo to the fire door question, notes the date and the fix, and updates the action plan’s status.
  5. Handed overJo signs the walk-round off in the main office. The district’s facilities lead has the PDF the same day: 23 deficiencies, each with its photos, its contractor and, for the closed ones, the after photo.
Illustration. Places, people and numbers are fictional.Easy Site Audit

Setting up a walk-round that holds up

  1. Fix the route once

    Pick the checklist that matches the building and walk it in its order. There is no separate field for where a deficiency is, so start each title with the area, for example “Science block L2, lab corridor fire door”. Issues can be dragged into route order, and searched by title later.

  2. Capture as you walk

    Photograph a problem and it becomes an issue with up to 5 photos. Or shoot the whole floor and add up to 50 photos at once; each becomes its own issue to name. Arrows, boxes and the measure tool show the contractor exactly where to look.

  3. Hand each deficiency to a contractor

    Write the contractor into Assigned To and set a priority. Color tags (Red, Green, Blue, Yellow, Orange) can stand for contractors or floors. On checklist answers, the action plan adds an assignee from your contacts, a phone number and a due date.

  4. Re-inspect and close

    Go back to the same project after the fix. Add the after photo and a comment with the date, then move it to Completed. The PDF doesn’t print status, so the comment is what tells the client it was checked.

  5. Start next month from this one

    Duplicate the project and choose what comes with it: titles, assignees, comments, photos, the checklist and color tags. Archive finished rounds and restore them when someone asks about March.

What a building walk-round covers

The ground a typical walk-round crosses. The ready-made checklists below go into each area in more detail.

Roof and exterior

  • Gutters, downpipes and roof drains are clear.
  • The roof hatch closes and locks, and the access ladder is sound.
  • Facade, flashing and sealant show no new cracks or gaps.

Entrances and circulation

  • Entrance doors open, close and lock as they should.
  • Stairs, handrails and floor finishes are free of trip points.
  • Elevators run, and the car and landing doors are undamaged.

Fire and life safety

  • Fire doors self-close fully and latch, with no wedges or hold-opens that don’t release.
  • Exit signs are lit and exit routes are clear to the outside.
  • Extinguishers are in place, tagged and unobstructed.

Mechanical and plant rooms

  • No leaks, drips or standing water around pumps and pipework.
  • Nothing is stored against electrical panels or in front of access doors.

Restrooms, kitchens and common areas

  • Fixtures work, with no leaks at traps or supplies.
  • Ceiling tiles, walls and floors show no stains or damage.

Grounds and parking

  • Lot and garage lighting works after dark.
  • Surfaces, curbs and markings have no new potholes or trip hazards.

Today and on the roadmap

  • TodayAnswering, photos, markup and the PDF all work with no signal, in the boiler room or under the roof.
  • TodayRename Issue to Deficiency and Assigned To to Contractor, and the app and the report use your words.
  • TodayEach walk-round ends in a signed, white-label PDF, shared by email or the iPhone and iPad share options.
  • On the roadmapScheduled walk-rounds, with a reminder when one is due.
  • On the roadmapAutomatic chasing of contractors on open deficiencies.
  • On the roadmapA web dashboard across sites, and an evidence trail with “Show me” replay links.

Questions people ask

Do our contractors need the app to see their deficiencies?

No. Only the person walking uses the Easy Site Audit app. Contractors get the PDF by email or the share options, and each entry shows the title, photos, markup, comments and the name in Assigned To.

Can the report say deficiency instead of issue?

Yes. You can rename six terms, including Issue, Report and Assigned To, and the new words appear in the app and on every report. Type whatever your contract uses, for example Deficiency, Walk-round and Contractor.

How do I run the same walk-round next month?

Duplicate the project. You choose what to copy: titles, assignees, comments, photos, the checklist and color tags. The new project starts with the same route and questions, ready for the next walk.

Can I take photos first and sort them out later?

Yes. Add up to 50 photos at once and each becomes its own issue, ready to name, assign and mark up. It suits a fast first pass of a floor, with the detail added before you sign off.

Make the next walk-round the one nobody can question.