Sheet PM-025 · Planned and preventive maintenance · Free template
Facility Management Checklist (free template)
The Facility Management Checklist gives every technician the same order of work: 17 sections, 133 questions, and an owner for each deficiency.
Every PPM task done, signed and on file before the client asks.
What it covers
The Facility Management Checklist runs to 17 sections and 133 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Roof
- Section 2: Parking Lots and Garages
- Section 3: Windows
- Section 4: Doors
- Section 5: Seasonal Building Preparations
- Section 6: During Spring
- Section 7: Electricity
- Section 8: Plumbing
- Section 9: During Cool Weather
- Section 10: During Warm Weather
- Section 11: Equipment
- Section 12: Total Energy Utilization
- Section 13: Elevators
- Section 14: Security Systems
- Section 15: Fire Equipment
- Section 16: ADA Accessibility
- Section 17: Safety Requirements
When to use it
Use it on the cycle your contract, the manufacturer or the insurer sets for this asset: weekly, monthly, quarterly or yearly. At 133 questions, it is a big checklist. Use the section list to plan the walk, and expect to come back to it more than once.
With 17 sections, from Roof to Safety Requirements, use the app’s Jump to section list rather than scrolling. Property managers use it too, for the same job across their buildings.
Who uses it
In-house facilities teams and service contractors use it; the facilities manager owns the deficiencies. Clients read it at the monthly or quarterly review; contract managers use it to show the SLA was met.
Before you walk it
- Work offline in plant rooms and risers, then share the PDF once you are back in signal.
- Use the client’s words: rename Issue to Deficiency in the app, so the report matches the contract.
- Leave the checklist section out of the report when the client wants only the deficiencies.
- Photograph the asset tag or rating plate first, so the report is tied to one asset.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Facility Management Checklist in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.
Walk it
Work through the 17 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.
Questions people ask
What does the client see?
One PDF per visit with your logo: the answers, notes, photos and any action plans, signed on the cover. No watermark, and no app needed to read it.
How often should the Facility Management Checklist be done?
On the cycle your PPM schedule sets for this asset, which usually comes from the manufacturer, the contract or the insurer. The checklist records each visit; it doesn’t set the cycle.
Is the Facility Management Checklist free?
Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Make the next walk-round the one nobody can question.
Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.