Sheet PM-014 · Planned and preventive maintenance · Free template
Daily Electrical Maintenance Checklist (free template)
One PPM visit, one record: 35 questions across 7 sections, photographed, signed and ready for the client review.
Every PPM task done, signed and on file before the client asks.
What it covers
7 sections and 35 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Electrical Room General Condition
- Section 2: Distribution Panels and Switchboards
- Section 3: Generators and Automatic Transfer Switches
- Section 4: UPS Systems
- Section 5: Emergency Lighting and Exit Signs
- Section 6: General Lighting and Electrical Fittings
- Section 7: Fault and Defect Log
When to use it
Use it on the cycle your maintenance plan or insurer sets, and after any fault, trip or alteration. At 35 questions, plan it as one sitting on site, not a quick tick on the way past.
7 sections, from Electrical Room General Condition through to Fault and Defect Log. The app shows the page you are on and how many are left as you go.
Who uses it
Electrical contractors and in-house engineers use it; clients and insurers receive the report. The report goes to the client’s facilities manager and into the asset’s maintenance record.
Before you walk it
- Type readings into the number answers where the checklist asks for them.
- The checklist is not your safe system of work: isolate and test as your procedure requires before you start.
- Title each project with the site, the asset and the visit date, so the history of one asset is one search away.
- Work offline in plant rooms and risers, then share the PDF once you are back in signal.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Daily Electrical Maintenance Checklist in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.
Walk it
Work through the 7 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.
Questions people ask
Does the Daily Electrical Maintenance Checklist replace an electrical certificate?
No. Where an electrical certificate or a licensed inspection is required, only a qualified person can issue it. The checklist is the structured record of your inspection or maintenance.
Does the Daily Electrical Maintenance Checklist replace a statutory inspection?
No. Where the law or an insurer requires a certified engineer’s inspection, the checklist doesn’t replace it. It records the planned maintenance your team does between those inspections.
Does the Daily Electrical Maintenance Checklist work offline?
Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.
Make the next walk-round the one nobody can question.
Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.