Electrical Panel Preventive Maintenance Checklist (free template)

4 sections, 38 questions, and an action plan on every deficiency, so the PPM record shows what was done and what is still open.

Every PPM task done, signed and on file before the client asks.

What it covers

38 questions across 4 sections. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Inspection and Monitoring Tasks
  2. Section 2: Maintenance and Repairs
  3. Section 3: Testing and Verification
  4. Section 4: Safety and Compliance Checks
ChecklistElectrical Panel Preventive Maintenance Checklist
StagePlanned and preventive maintenance
LaneFacilities and maintenance teams
Sections4
Questions38
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Oct 16, 2024
PriceFree on every plan

When to use it

Use it on the cycle your maintenance plan or insurer sets, and after any fault, trip or alteration. 38 questions makes a focused inspection: long enough to cover the job properly, short enough to finish in one visit.

The 4 sections split the job into Inspection and Monitoring Tasks, Maintenance and Repairs, Testing and Verification and Safety and Compliance Checks.

Who uses it

Electrical contractors and in-house engineers use it; clients and insurers receive the report. Facilities managers read it to see what is open; auditors and insurers ask for it later.

Before you walk it

  • Type readings into the number answers where the checklist asks for them.
  • The checklist is not your safe system of work: isolate and test as your procedure requires before you start.
  • Where the checklist asks for a reading, type the number in, so the next visit can compare.
  • Raise each deficiency as an action plan with the contractor, a priority and a due date. Open work stays visible until it is completed.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Electrical Panel Preventive Maintenance Checklist in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 4 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.

Questions people ask

Does the Electrical Panel Preventive Maintenance Checklist replace an electrical certificate?

No. Where an electrical certificate or a licensed inspection is required, only a qualified person can issue it. The checklist is the structured record of your inspection or maintenance.

What does the client see?

One PDF per visit with your logo: the answers, notes, photos and any action plans, signed on the cover. No watermark, and no app needed to read it.

Is the Electrical Panel Preventive Maintenance Checklist free?

Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.