Factory Acceptance Test Checklist (free template)
6 sections, 37 questions, and an action plan on every deficiency, so the PPM record shows what was done and what is still open.
Every PPM task done, signed and on file before the client asks.
What it covers
The Factory Acceptance Test Checklist runs to 6 sections and 37 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Visual Appearance
- Section 2: Safety
- Section 3: Electrical
- Section 4: Machine
- Section 5: Defective Part Detecting
- Section 6: Vision
When to use it
Use it at start-up and functional testing, with the installer present, so the readings and results are recorded once, on the day. At 37 questions, plan it as one sitting on site, not a quick tick on the way past.
The 6 sections run from Visual Appearance to Vision, and the app’s Jump to section list takes you straight to any of them.
Who uses it
Installers use it as their own test record; the client’s engineer witnesses the tests. Facilities managers read it to see what is open; auditors and insurers ask for it later.
Before you walk it
- Photograph the rating plate and the controls display at the time of each test.
- Raise an action plan for each open item, so acceptance waits on a short list, not a vague one.
- Where the checklist asks for a reading, type the number in, so the next visit can compare.
- Raise each deficiency as an action plan with the contractor, a priority and a due date. Open work stays visible until it is completed.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Factory Acceptance Test Checklist in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.
Walk it
Work through the 6 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.
Questions people ask
Does the Factory Acceptance Test Checklist replace the commissioning specification?
No. Follow the specification and the manufacturer’s procedure. The checklist is the structured record of what was tested and found, with photos and readings.
Does the Factory Acceptance Test Checklist replace a statutory inspection?
No. Where the law or an insurer requires a certified engineer’s inspection, the checklist doesn’t replace it. It records the planned maintenance your team does between those inspections.
Is the Factory Acceptance Test Checklist free?
Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Make the next walk-round the one nobody can question.
Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.